Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 L+₹2.1 L (42.7%)Rejected-Finance CHERUKARAKUDIYIL POOPARA | ₹7.1 L+₹2.1 L (42.7%) | L2 | Rejected-Finance L2 |
Tender Value
₹6.0 L
EMD Value
₹15,100
Closing Date
25 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER-PMU, THODUPUZHA
EXECUTIVE ENGINEER-PMU, THODUPUZHA
REROUTING 11KV ARAKULAM FEEDER ANATHARA JUN TION TO KAVALAM CITY TRANSFORMER
2026_KSEB_848399_2
PMU/ TDPA/E tender/01/2026-27/ dated 08.04.2026
Open Tender
Electrical Works
Percentage
90 days
MOOLAMATTAM IDUKKI
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,534
₹15,100
4 Jun 2026
7 May 2026
26 May 2026
7 May 2026
25 May 2026
7 May 2026
7 May 2026 - 12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FittinganderectingoneHTPSCSinglePoleinposition,includingfitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 58 | No | 3,274.36 | ₹1,89,912.88 |
| 2 | LabourchargesforloadingHTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). | 66 | No | 762.14 | ₹50,301.24 |
| 3 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. | 66 | No | 158.91 | ₹10,488.06 |
| 4 | AdditionalrateforexcavationofonePitforHTPole/HTStayinHard Laterite. | 2 | No | 868.77 | ₹1,737.54 |
| 5 | AdditionalrateforexcavationofonePitforHTPole/HTStayinSoft Rock. | 17 | No | 1,303.68 | ₹22,162.56 |
| 6 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 55 | No | 1,373.73 | ₹75,555.15 |
| 7 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 15 | No | 434.91 | ₹6,523.65 |
| 8 | FittingandprovidingoneStrutusingHTPSCpoleincludingdiggingand back filling pit in ordinary soil. | 2 | No | 3,056.91 | ₹6,113.82 |
| 9 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole includingdiggingandbackfillingpitsinordinarysoil,drawingsufficient lengthofGIearthleadstothegroundforearthing(excludingprovisionof earthing). | 2 | No | 4,805.95 | ₹9,611.9 |
| 10 | FittingoneAdditionalVcrossarminexistingsinglepoleincluding conveyance of materials. | 2 | No | 481.95 | ₹963.9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435373.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
GCC.pdf
Tender Documents • 1.04 MB
Generaltermconditions.pdf
Other Document • 0.99 MB
SpecialCondition.pdf
Additional Documents • 0.73 MB
BOQ_1435373.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .