Loading…
Loading…
Tender Value
₹16.3 L
EMD Value
₹16,500
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer’s office, Valsad (R&B) Division,
Preconstruction activity for four lanning of Vadpada Karanjveri Road (SH) Km. 38/4 to 45/0,Ta. Dharampur Dist.: Valsad ( Cutting of Tree and stacking in Godown of Forest Department)
346848
19 Of 2026-27
Open
Civil - All
Works
Valsad
8 documents required · 8 mandatory
₹900
Executive Engineer, Valsad (R&B)Division, Valsad
₹16,500
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Sr. Description of Item Quantity Unit Rate Amount
1 Cutting the tree & removal of roots, the work shall consist of cutting 861.00 MT 1895.20
of all such trees as per the direction of engineer and further as per
duly approved plan by the forest department. This shall include duly
approved stacking, tranporting, final handling over to forest
department Depot with all leads and lift, work to comply strictly in
accordance with making divrsion for traffic movement on road,co-
ordinate with Electric & Other site issue related department and also
comply with technical specifications.Removal of tree roots disposal
and filling of pits as Directed by Engineer in Chargeas.Rate is
included with all lead and lift
for All Girth of Trees .
Deputy Executive Engineer, Executive Engineer
Dharampur (R&B) Sub Division Valsad (R&B) Division
Dharampur Valsad
I/We am/are willing to carry out the work at ………………………………………………..% above/below (percent should be
written in figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated amount *Estimated amount
Put to tender Rs…1631765.98 Put to tender Rs…1631765.98
Deduct ……. % below Rs……………… Add ……. % Avove Rs…………..….
Net Rs. ……………… Total Rs. ………….…
In words ………………….…………………… In words ………………….
*( please strike out whichever is not applicable)
An Amount of 0.00 (Rupees ) shall be recovered from the 1st RA Bill of this work towards salvage value of dismentalled /
Diversion material likely to be available from dismentalling the Dismentaling of stone flooring irrespective of the
dismentalled quantity actuallly received on site.
All works shall be carried out as public works department Handbook and other
specification of Division or as directed.
All the columns in schedule should be filled in ink or ballpen and the total of the
entries in last column should be struck by the contractor under his signature.
Rate quated include clearance of site (Prior commencement of work and at its close)
in all respects and hold good for work under all conditions,site moisture, weather etc.
The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
To be continued on additional sheet,if found necessary.
Deputy Executive Engineer, Executive Engineer
Signature of the contractor Dharampur (R&B) Sub Division Valsad (R&B) Division
ÀùËÿëÀËßÞí çèí Dharampur Valsad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SPECIFICATIONS.pdf
Tree Cutting SBD.pdf
SBD Tree cutiing sudharo.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .