Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC Committee approved L1 | |
| 2 | L2₹1.7 L+₹700 (0.42%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.7 L+₹3,460 (2.09%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹1,700
Closing Date
12 Oct 2023, 5:00 pmClosed
SE EUDC BAREILLY
35-B RAMPUR GARDEN BAREILLY
ELECTRIFICATION WORK UNDER DEPOST FUND 2023-24 UNDER EUDD-II BAREILLY
2023_MVVNL_838684_1
T-112/EUDCB/2023-24
Open Tender
Electrical Works
Item Rate
45 days
EE EUDD-II BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹1,700
1 Jan 2024
16 Sept 2023
13 Oct 2023
16 Sept 2023
12 Oct 2023
16 Sept 2023
Amount
For the work of Giving New Connection of 45 KW(HV-6) to Shri Mustkeen S/o Shri Abdul Shakoor, Parsakhera ,Bareilly under full deposit fund 2023-24 under EUDD-II, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
PCC Pole 8.5 meter Long
New 63 KVA T/F
other associated materials
Erection Work
Erection of PCC D/P with 01 NO existing PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Mounting of 63 KVA T/F alongwith making all connections.
Earthing of 63 KVA water level body & neutral with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Stinging & sagging of weasel conductor .
Fixing of associated Items i.e. Top Channel-01 No., Base Angle-02 Nos.,, Dropper Channel- 02, 11 Pin Insulator With Pin-06 No. Etc.
For the Work of Increasing capacity from 25 KVA To 63 KVA of Chief Manager, Indian Bank, Civil Lines, Bareilly under full deposit fund 2023-24 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST Pole 11 meter Long
11 KV Pilfer Proof metering Cubical
11 KV XLPE Cable (3x120 sqmm)
Cable Jointing Kit & I/D & O/D (3X120 sqmm)
other associated materials.
Erection Work
Erection of ST D/P including digging of pit & grouting work complete and fitting of all accessories complete.
Erection of Stay Set Complete
Earthing of 11 KV Pilfer Proof Metering cubical water level body & neutral with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Laying(underground) of 11 KV XLPE Cable (3x120 sqmm)
Fixing of Cable Jointing Kits I/D & O/D (3X120 SQMM)
Stringing & Sagging of DOG Conductor
Hoisting of. 40 meter 11 KV XLPE Cable on D/Poles situated at both side of road including cost of 10 meter 6 inch dia G.I Pipe (Material will be supplied by Contractor).
Installation and commissioning of 11 KV Pilfer Proof Metering cubical CTR 20/5 Amp.
Fixing of associated Items i.e. Top Channel-04 No., 11 KV Disc Insulator with Fitting-06 No.,02 Nos., 11 KV Pin Insulator with Pin-15 Etc.
Qazi contractor and suppliers
PL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .