EE MDDA DEHRADUN
MDDA DEHRADUN
CONSTRUCTION OF UTTARAKHAND AGITATOR MARTYR MEMORIAL AT VIKASNAGAR DERADUN.
2026_MDDA_101124_1
1004/Develoment Work/2026-27 Dt 22.08.2026
Open Tender
Civil Works
Percentage
270 days
VIKASNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SECRETARY MDDA
₹5.4 L
9 Oct 2026
9 Oct 2026
16 Oct 2026
10 Oct 2026
15 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting outthe excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil. | 298.87 | cum | 231.81 | ₹69,281.05 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 129.38 | cum | 174.55 | ₹22,583.28 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty)
by mechanical transport upto a lead of 5km also including ramming
and watering of the earth in layers not exceeding 20 cm in foundation
trenches, plinth, sides of foundation etc. complete for all lift. | 248.12 | cum | 623.82 | ₹1,54,782.22 |
| 4 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 20.19 | cum | 1,891.29 | ₹38,185.15 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement:3 coarse sand (zone-ll) derived from natural sources : 6 graded stone aggregate 40 mm nominal
size derived from natural sources) | 30.96 | cum | 6,392.98 | ₹1,97,926.66 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 29.17 | cum | 6,563.88 | ₹1,91,468.38 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement:1.5 coarse sand (zone-||1) derived from natural sources:3 graded stone aggregate 20 mm nominal size derived from natural sources) | 143.44 | cum | 8,055.62 | ₹11,55,498.13 |
| 8 | Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns,
pillars, piers, abutments, posts and struts etc. above plinth level up to
floor five level, excluding cost of centering, shuttering, finishing and
reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand(zone-|||) derived from
natural sources:3 graded stone aggregate 20 mm nominal
size derived from natural sources) | 32.07 | cum | 9,665.01 | ₹3,09,956.87 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies,shelves, chajjas, lintels, bands,plain window sills,staircases and spiral stair cases above plinth level up
to floor five level, excluding the cost of centering, shuttering, finishing and
reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-lll) derived
from natural sources :3 graded stone aggregate 20 mm nominal size
derived from natural sources) | 273.11 | cum | 10,246.14 | ₹27,98,323.3 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars | 58,814.66 | Kg | 95.38 | ₹56,09,742.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
SBDAGITATORMEMORIAL.pdf
Tender Documents • 1.66 MB
BOQ_119165.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .