| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.7 LAccepted-Finance | L-1 | Accepted-Finance Responsive | |
| 2 | L-2₹3.9 L+₹19,450.50 (5.31%)Accepted-Finance V P O JACHH TEHSIL NURPUR DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | L-2 | Accepted-Finance Responsive | |
| 3 | L-3₹3.9 L+₹24,064.20 (6.57%)Accepted-Finance | L-3 | Accepted-Finance Responsive |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
7 Jul 2022, 11:00 amClosed
DM Nurpur
DM Nurpur
Construction of RCC Retaining wall in front and middle near NH road for proposed RSD at Nurpur
2022_FDC_62358_1
DM HSD Nurpur 02
Open Tender
Civil Works
Item Wise
90 days
Nurpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹600
Yes
DM Nurpur
₹50,000
Yes
8 Jul 2022
1 Jul 2022
7 Jul 2022
2 Jul 2022
7 Jul 2022
2 Jul 2022
Amount
i Excavation in foundation for retaining wall lift upto 1.5 mtr with pick spade work ,stacking of excavated soil not more than 3 meter clear from the edge of the excavation,consolidated each refilling layer by ramming and disposing all surplus soil with in lead of 20 mtr .............. No L B H Qty . 1.00 3.00 0.90 .60+.85/2 1.96 ii Excavation in earth foundation for boulder stone soling with hand packed on ground (between internal road and platform) .............. No L B H Qty . 1.00 6.00 15.00 0.20 18.00 iii Excavation for side RRSM R/Wall for soling and portion i.e connected part . 1.00 15.00 0.60 0.45 4.05 Total 24.01
Cutting in earth work and disposal of excavated earth upto a lead of 20 mtr with chieseling/wedge out of soft rock .............. No L B H Qty . 1.00 37.00 0.90 0.60 19.98
Providing and Laying of cc 1:6:12 in foundation with compaction(excluding rock portion) and curing complete .............. No L B H Qty . 1.00 3.00 0.90 0.10 0.27 ii under side r/wall of connected part . 1 15.00 0.60 0.10 0.90 Total 1.17
Laying of RRSM in CM 1:6 in side wall .............. No L B H Qty . 1.00 15.00 0.60 0.35 3.15 . 1 15x0.60/2 - 0.60 2.70 Total 5.85
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2.00 40.00 - 1.05+1.50/2 102.00
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1.00 40.00 0.90 0.15 5.40 Vertical wall . 1.00 40.00 0.15 1.05+1.50/2 7.65 Total 13.05
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side 0.90x133 Long side 4x40 Vert. wall,cross side 160x1.30 Total 487.70x0.89 = 4.34 Qtl-1 Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl- G Total i/c wastage & w/wire = 6.50 Qtl
Dry randun rubble stone mas. Behind retaining wall .............. No L B H Qty . 1.00 40.00 0.30 1.05+1.50/2 15.30
Earth and Boulder stone filling behind R/wall(50:50) stone- 45cum .............. No L B H Qty . 1.00 40.00 5x.90/2 - 45.00
Providing and laying of boulder stone soling with hand packed on ground (between internal road and platform) .............. No L B H Qty . 1.00 6.00 15.00 0.20 18.00
Excavation in foundation for retaining wall lift upto 1.5 mtr with pick spade work ,stacking of excavated soil not more than 3 meter clear from the edge of the excavation,consolidated each refilling layer by ramming and disposing all surplus soil with in lead of 20 mtr .............. No L B H Qty . 1 40 .90 .75+.85/2 28.80
Providing and Laying of cc 1:6:12 in foundation with compaction and curing complete .............. No L B H Qty . 1 40 0.9 0.10 3.60
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2 40 - 1.20+1.05/2 114.40
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1 40 0.9 0.15 5.40 vertical wall . 1 40 0.15 1.20+1.05/2 8.55 Total 13.95
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side .90x133 Long side 4x40 Vert. wall,cross side 160x1.43 Total 509.00x0.89=4.53 Qtl Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl including wastage and w/wire= 7.00 Qtl
Earth and Boulder stone filling behind R/wall .............. No L B H Qty .. 1 40.00 .90x1/2 - 18.00
ASHISH DOGRA
M/S ATUL THAKUR GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .