Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.2 L+₹9,705.33 (2.35%)Admitted-Fee/PreQual/Technical/Finance NEDUMBASSERY P O ERNAKULAM DIST | ERNAKULAM | KERALA | 683585 | ₹4.2 L+₹9,705.33 (2.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.4 L+₹26,699.31 (6.45%)Admitted-Fee/PreQual/Technical/Finance | ₹4.4 L+₹26,699.31 (6.45%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SANILKUMAR.A.G L2 | NANDANAN V K L3 | Sijo P. L L1 |
|---|---|---|---|---|---|---|
| 1.00TILE PAVEMENT | ||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 70.56 | cum | 441 ₹31,116.96 | 459 ₹32,387.04 | 431.35 ₹30,436.06 Lowest |
| 1.00 | OD127373/2026-2027:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 0.75m bottom width 1.5m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc. complete, modified 60.1.2 | 6 | RM | 1,122.95 ₹6,737.7 | 1,168 ₹7,008 | 1,097.12 ₹6,582.72 Lowest |
| 1.00 | OD127374/2026-2027:Bailing out water using 5HP pump Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel , lubrication oil and other stores, pay of staff etc. complete Modified 60.2.2 | 28 | hour | 474.87 ₹13,296.36 | 494 ₹13,832 | 463.95 ₹12,990.6 Lowest |
| 1.00 | OD126633/2026-2027:Dry rubble masonry - Dry rubble masonry with goor quality blasted rubble including conveyance of materials and labour charges etc. complete as per the direction of departmental officers at site Modified 60.71 | 72 | cum | 4,160.22 ₹2,99,535.84 | 4,327 ₹3,11,544 | 4,064.53 ₹2,92,646.16 Lowest |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.96 | cum | 9,554.21 ₹37,834.67 | 9,936 ₹39,346.56 | 9,334.46 ₹36,964.46 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.35 | tonne | 1,00,437 ₹34,952.08 | 1,04,454 ₹36,349.99 | 98,127.25 ₹34,148.28 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,588
Closing Date
16 Sept 2026, 4:00 pmClosed
Assistant Engineer
O/o The Assistant Executive Engineer LSGD Sub Division Parakkadavu Block Panchayath
Annual Plan-PKD BP 187/2026-27-SHEEBA PAULSON MEMMORIAL LIFT IRRIGATION MAINTENANCE PHASE 1 IN KUNNUKARA GP-General Civil Work
2026_LSGD_868361_1
7/26-27
Open Tender
Civil Works - Others
Item Rate
LSGD Sub Division Parakkadavu Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,588
Yes
17 Sept 2026
8 Sept 2026
17 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1TILE PAVEMENT | |||||
| 1.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 70.56 | cum | - | - |
| 1.002 | OD127373/2026-2027:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 0.75m bottom width 1.5m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc. complete, modified 60.1.2 | 6 | RM | - | - |
| 1.003 | OD127374/2026-2027:Bailing out water using 5HP pump Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel , lubrication oil and other stores, pay of staff etc. complete Modified 60.2.2 | 28 | hour | - | - |
| 1.004 | OD126633/2026-2027:Dry rubble masonry - Dry rubble masonry with goor quality blasted rubble including conveyance of materials and labour charges etc. complete as per the direction of departmental officers at site Modified 60.71 | 72 | cum | - | - |
| 1.005 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.96 | cum | - | - |
| 1.006 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.35 | tonne | - | - |
stage.html
html • 0.02 MB
finance_1470631.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 1.90 MB
BOQ_1470631.xls
BOQ • 0.30 MB
CORRISHEEBA.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .