| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹9.0 LAccepted-Finance 00 SAMARPURA VIJAYSINGHPURA KUSHALPURA JAIPUR RAJASTHAN 303806 | JAIPUR | RAJASTHAN | 303806 | H1 | Accepted-Finance After QCBS bidder was H1 | |
| 2 | H2₹8.6 L−₹43,000 (4.79%)Rejected-Finance PLOT NO 231 BEHIND CHRIST MEMORIAL MIDDLE SCHOOL JAIN NAGAR BHOPAL BHOPAL MADHYA PRADESH 462030 | BHOPAL | MADHYA PRADESH | 462030 | H2 | Rejected-Finance After QCBS bidder was H2 | |
| 3 | H3₹10.7 L+₹1.7 L (19.2%)Rejected-Finance BUDGAM JAMMU KASHMIR 191113 INDIA UDYAM JK 04 0000108 | BUDGAM | JAMMU AND KASHMIR | 191113 | H3 | Rejected-Finance After QCBS bidder was H3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Non responsive |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 Nov 2022, 6:00 pmClosed
ACEO JSCL
Jammu
Rate Contract for Conducting Topographic Survey of Jammu Smart City Projects
2022_SPV_194297_1
JSCL- 67/11 of 2022-23
Open Tender
Survey and Investigation Services
Item Wise
545 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
CEO Jammu Smart City Ltd
₹20,000
Jammu
4 Jan 2023
1 Nov 2022
23 Nov 2022
1 Nov 2022
21 Nov 2022
12 Nov 2022
10 Nov 2022
Laying and Jointing PVC Pipe. Heading
Survey of Roads The survey work of roads shall comprise of: i. Site plan depicting adjoining features like drain, electric poles, trees, existing retaining walls, breast walls ,link roads, cross drainage or any other feature to depict the complete topography of the area, with RD marked on the ground. ii. L-section of the road along the alignment of peg points or central line iii. Cross sections to be taken at 25 m interval and at the points of abrupt transition s for a minimum width of 30 m (15 m on either side of the central line or as per the site requirement /directions of the Engineer-in-Charge. Note: The bidder shall submit the feature either as above-mentioned or as per annexure 9 as per the directions of the Engineer-in-Charge.
Survey of land strip/ Chowks The survey work shall comprise of: i. Site plan shall include contouring mapping depicting adjoining features like drain, electric poles, trees, or any other features to depict the complete topography of the area. ii. Cross-sections at 25 m interval iii. L-sections, if required, as per directions of Engineer-in-Charge. Note: The bidder shall submit the feature either as above-mentioned or as per annexure 9 as per the directions of the Engineer-in-Charge.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .