Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.9 LRejected-AOC | ₹16.9 L | L2 | Rejected-AOC Not Accepted |
| 3 | L3₹16.9 LRejected-Finance AT WARD NO 17 SUNDARGARH TOWN SUNDARGARH | SUNDARGARH | ODISHA | 754217 | ₹16.9 L | L3 | Rejected-Finance As per Lottery |
| 4 | L4₹16.9 LRejected-Finance AT DEULI PS SADAR SUNDARGARH | KENDRAPARA | ODISHA | 754217 | ₹16.9 L | L4 | Rejected-Finance As per Lottery |
| 5 | L5₹16.9 LRejected-Finance | ₹16.9 L | L5 | Rejected-Finance As per Lottery |
Tender Value
₹17.0 L
EMD Value
₹16,956
Closing Date
27 Apr 2026, 5:00 pmClosed
Executive Officer, Sundargarh Municipality
Executive Officer, Sundargarh Municipality
Construction of Mother Drain from Pandey house to Rajesh Toppo house at Sriram Nagar in ward No-18
2026_ORULB_128029_5
SNGM-01/2026-27
Open Tender
Civil Works - Others
Percentage
Sundargarh Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,956
Yes
19 Aug 2026
13 Apr 2026
28 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantalling & removing cement concrete including stacking the udeful marerials for reuse & removing the debries within 50 mtr lead. | - | cum | - | - |
| 2 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | - | cum | - | - |
| 3 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | - | cum | - | - |
| 4 | Metal concrete (1 : 3: 6) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | - | cum | - | - |
| 5 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | - | cum | - | - |
| 6 | R.C.C. work of M 15 using 20mm and down graded hard granite Crusher broken chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete including centering and shuttering. | - | cum | - | - |
| 7 | Labour for M.S reinforcement for cutting, bending, binding, tying the grills and placing in position etc. including cost of binding wire 18 to 20 guage and cost of steel. | - | qtl | - | - |
| 8 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. | - | sqm | - | - |
| 9 | Using of plate Vibrator. | - | hrs | - | - |
| 10 | Towards Photograph of project, display board etc & other unforseen items | - | Nos | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_587609.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].