Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance H NO 18 272 SHIRWAI QUEPEM GOA | QUEPEM | SOUTH GOA | GOA | L1 | Accepted-Finance L1 | |
| 2 | L2₹13.6 L+₹98,109.92 (7.75%)Rejected-Finance H NO 243 TILAMOL QUEPEM GOA | QUEPEM | GOA | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K Y VARGHESE BABY L2 | Manju Shankar Gavli L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq. m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : a)All kinds of soil. | 16 | cum | 298 ₹4,768 | 277 ₹4,432 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 5 | cum | 2,310 ₹11,550 | 2,145 ₹10,725 Lowest |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in : a)All works upto plinth level | 4 | cum | 7,117 ₹28,468 | 6,605 ₹26,420 Lowest |
| 4.00 | Exposed decorative laterite masonry using Patradevi stone of size as specified and laid as directed by architect in cement mortar 1:4 (1 cement : 4 coarse sand). | 18 | cum | 10,145 ₹1,82,610 | 9,416 ₹1,69,488 Lowest |
| 5.00 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 17 | Sq.m | 256 ₹4,352 | 237 ₹4,029 Lowest |
| 6.10 | Centering & shuttering including Strutting, Propping & removal of forms for : i) Foundations, Footings, Bases for columns. | 17 | Sq.m | 425 ₹7,225 | 394 ₹6,698 Lowest |
| 6.20 | iv) sides and Soffits of beams, Beam Haunching, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | 33 | Sq.m | 430 ₹14,190 | 399 ₹13,167 Lowest |
| 6.30 | xiii)Suspended floors, roofs landings, shelves & their supports | 80 | Sq.m | 672 ₹53,760 | 624 ₹49,920 Lowest |
| 7.00 | Centering & shuttering including Strutting, Propping & removal of forms for sloping or battering surface (slabs, beams, louvers, etc) including folded plates. iii) Columns, Pillars, Posts & struts (circular or curved in plan) | 6 | Sq.m | 757 ₹4,542 | 703 ₹4,218 Lowest |
| 8.10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a)All works upto plinth level | 1 | cum | 7,501 ₹7,501 | 6,962 ₹6,962 Lowest |
Tender Value
₹13.1 L
EMD Value
₹26,154
Closing Date
21 Oct 2025, 4:00 pmClosed
EE XI, WRD
Ravonfond, Navelim
Construction of Cabin for Security Personnel at minor irrigation tank Gavanem in Canacona Taluka
2025_WRD_25093_1
WDXI/PB/F.24/2025-26/1011/Sr3
Open Tender
Miscellaneous Works
Item Rate
45 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹26,154
17 Dec 2025
9 Oct 2025
23 Oct 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_25517.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .