Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 CrAdmitted-Finance | ₹21.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹21.8 CrAdmitted-Finance | ₹21.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹23.4 CrAdmitted-Finance | ₹23.4 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per BOO |
| Sl No | Description | Qty | Unit | MKM SALES AGENCY L2 | Integrated Pavement Solutions L1 | LSR Logistics Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00Part 'A' (Between Km 275.00 to Km 277.160 on BCT Road) | ||||||
| 1.01 | Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018 | 30,178.64 | Sqm | 4,37,59,028 ₹4.9 Cr | 4,27,02,775.6 ₹4.8 Cr | 4,75,31,358 ₹5.3 Cr |
| 1.02 | Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications. | 14,469.21 | Sqm | 42,68,416.95 ₹47.8 L | 40,51,378.8 ₹45.4 L | 44,85,455.1 ₹50.2 L |
| 1.03 | Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM. | 14,469.21 | Sqm | 28,21,495.95 ₹31.6 L | 25,32,111.75 ₹28.4 L | 27,49,149.9 ₹30.8 L |
| 2.00Part 'B' (Between Km 281.150 to Km 287.156 on BCT Road) | ||||||
| 2.01 | Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018 | 85,164.28 | Sqm | 12,34,88,206 ₹13.8 Cr | 12,05,07,456.2 ₹13.5 Cr | 13,41,33,741 ₹15.0 Cr |
| 2.02 | Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications. | 40,832.19 | Sqm | 1,20,45,496.05 ₹1.3 Cr | 1,14,33,013.2 ₹1.3 Cr | 1,26,57,978.9 ₹1.4 Cr |
| 2.03 | Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM. | 40,832.19 | Sqm | 79,62,277.05 ₹89.2 L | 71,45,633.25 ₹80.0 L | 77,58,116.1 ₹86.9 L |
Tender Value
₹19.2 Cr
EMD Value
₹12.8 L
Closing Date
22 Dec 2020, 10:00 amClosed
CHIEF ENGINEER PROJECT VARTAK
HQ CE Project Vartak Tezpur 784001 Assam
PROVIDING AND LAYING OF 150MM X 2 LAYERS OF CEMENTITIOUS BASE CTB INCLUDING PREPARATION OF SOIL BED FINISHED WITH 10MM THICK SAMI LAYER OVER MECHANICALLY CHISELLED AND MECHANICALLY CLEANED CTB SURFACE DULY PRIMED WITH PRIMER COAT FOR THE SURFACING W
2020_BRO_600076_1
CE (P) VTK/NIT/05/2020-21
Open Tender
Civil Works - Roads
400 days
KM 275PT00 TO KM 277PT160 KM 281PT150 TO 287PT156
15 documents required · 15 mandatory
₹0
₹12.8 L
Yes
HQ CE PROJECT VARTAK
13 Feb 2021
1 Dec 2020
23 Dec 2020
2 Dec 2020
22 Dec 2020
10 Dec 2020
2 Dec 2020 - 8 Dec 2020
9 Dec 2020
Part 'A' (Between Km 275.00 to Km 277.160 on BCT Road)
Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018
Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications.
Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM.
Part 'B' (Between Km 281.150 to Km 287.156 on BCT Road)
Providing and Laying Base Coarse incorporating Chemical Admixture in combination with OPC Grd. 43 - “Providing and Laying of 150mm X 2 Layers of Cementitious Base (CTB) including Preparation of Soil Bed, for the Surfacing Works in Accordance With Relevant Clauses Of IRC37:2018 and IRC-SP-89:2018
Providing and Laying SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB Layer by means of Synchronous Chip Sealer Integrated Computer Controlled Machinery. SAMI Layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately Covered with Stone Chips as per relevant clauses of IRC37:2012, IRC-110:2005 & IRC-SP-34:1989 and as per tender specifications.
Providing and Laying Primer Coat over CTB Layer and prior to application of SAMI Layer. The Application of Primer Coat shall comprise of 1ST roughening the cured CTB top turf by means of mechanically chiseling and removing any undesirable dry skin followed by cleaning by mechanically brooming -off and/or removal of the muck using tractor driven pressure compressors. 2nd – application of the SS-1 Grade Bitumen Emulsion Primer Coat @ 0.75Kg/SqM.
MKM SALES AGENCY
LSR Logistics Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_630483.xls
BOQ • 0.28 MB
TenderdocNIT05.pdf
Tender Documents • 1.72 MB
IP05.pdf
Additional Documents • 5.75 MB
Download all tender documents and submit your bid