| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹6.2 L+₹499.04 (0.08%)Rejected-Finance VILL GACHARATI P O TAKI P S BASIRHAT NORTH 24 PARGANAS PIN 743429 | TAKI | NORTH 24 PARGANAS | WEST BENGAL | 743429 | L2 | Rejected-Finance Not L1 bidder | |
| 3 | L3₹6.2 L+₹561.42 (0.09%)Rejected-Finance | L3 | Rejected-Finance Not L1 bidder |
Tender Value
₹6.2 L
EMD Value
₹12,476
Closing Date
30 Mar 2026, 10:00 amClosed
Assistant Engineer, Hasnabad Sub-Division, P.H.E.
Thuba More, Taki, North 24 Pgs.
Operation and maintenance of IE Plant at Chandpur Water Supply Scheme (Z-I) under Hasnabad Sub-Division, PHE Dte. For the period 1 (one) year.
2026_PHED_1021358_10
WB/PHED/AE/HSD/NIET-21/HSD OF 2025-26
Open Tender
CIVIL WORKS
Percentage
365 days
Chandpur, Hasnabad, North 24 Pgs.
Please refer Tender documents.
6 documents required · 6 mandatory
₹12,476
18 Jun 2026
13 Mar 2026
1 Apr 2026
13 Mar 2026
30 Mar 2026
13 Mar 2026
Opening & closing of all the different dia sluice valves on different places along the alignment of the rising main and distribution main within Head Works site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point oropening the sluice valves de-jointing flange joints including repairing works and cleaning the [pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, refilling the excavated earth, taking out of RCC slab or slab cover and prefixing true to position etc. all complete as per the specification and direction of ELC ( For 2 Nos. Operators). Providing dress (shirt & pant) 2 sets in ayear inc. shoe, tourch, Battery, whitsle, Cap etc. of approved qualiy. 2 nos operator per day (365x2) =730 days conside EPF & ESIC for 26 days per month.
Supervision charges for electrical installation by Electiician per lE Rules, 1956 read with latest amendments overhead expenditures.
During the period of Operation & Maintenance, all necessary man power technical skilled or unskilled, all accessories (civil, mechanical, electrical and instrumental) oil,lubricants and other consumable materials for Blower & Compressor etc which are required for normal operation shall be provided by the contractor at his own cost, PHE Department will bear only the cost of electricity. Any petty repairing, break down or consumable materials for repairs etc that during the idle period shall be borne by the contractor. lf the constrictor fails to rectify or replace the defects in removable time, the same will be done by employing other agency and the realm expenditure will be realized from the payments and S D.Money Responsiblc technical reprcsentative of the contractor must visit the site at regular intervals and also on call duing thc period and infom to tle E.l.C.
During the period of Operation & Maintenance, all necessary manpower technical skilled or unskilled, all accessories related to all kind of valves of pipelines and vessels which are required for normal operation shall be provided by the contractor at his own cost, maintenance of pipelines related to IEP within head works site Any petty repairing or defect shall be promptly rectified or replaced by contractor during the idle period shall be borne by the contractor. lf the contractor fails to rectify place the defects in reasonably time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D Money. Responsible technical representative of the contractor must visit the site atregular interval and also on call during the period and inform to the ElC.
Chemical & Bacteriological testing of Raw Water & Treated Water sample including cost of collection after each unit carrying to designated PHE/ other laboratories up submission of report to the E.l,C. at regular interval (2 times for 6 months)
Provision for making payment towards labour wages in case of enhancement within the stipulated period of the said work to be paid in the following manner [Eenhancement of wages + 8.33% bonus over wages + 10% contractors profit over both wage & bonus]
Add Cess@1% Rs.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.72 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 0.43 MB
Tendernotice_4.pdf
PDF • 0.16 MB
BOQ_2511424.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .