| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAdmitted-Finance | ₹15.5 L | L1 | Admitted-Finance |
| 2 | L2₹15.7 LAdmitted-Finance | ₹15.7 L | L2 | Admitted-Finance |
| 3 | L3₹15.9 LAdmitted-Finance | ₹15.9 L | L3 | Admitted-Finance |
| 4 | L4₹16.8 LAdmitted-Finance | ₹16.8 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Work Order Pg. No. 264 to 265 for Rs.12,89,429.00 is submitted. However, the work completion certificate for the said work is not furnished. |
| Sl No | Description | Qty | Unit | LINGAM RAVI KIRAN L4 | M N NAIDU CONSTRUCTIONS L1 | CHINTHADA VENKATA RAO L3 | V SURENDRA NAIDU L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Deracinating, uprooting, plucking out and felling dense/medium/normal jungle /vegetation growth, shrubs, rank vegetation, grass, brushwood, trees and saplings of any girth including removal of roots up to a depth of 60 cm from the ground level or 30 cm from the structures without disturbing the adjoining structural members and protecting the structures from any type of damages, refilling the holes / hollows/ ground area formed by digging for uprooting tree &stumps with earth/stones well rammed, refilling the cavities arising out of the trees removed from the fort/structure with same members if available at site so that the surface at these points confirm not allowing to re-grow of trees from the roots if any remains in the core/ground, pruning of wood, branches, twigs of any trees if any, applying weedicide if any, stacking all useful trunks/logs/materials arising out from the cleaning and grabbing operations, disposing all unserviceable materials far away or fired in piecemeal, including the cost of tools, scaffolding, equipment etc., complete as directed by the site in-charge. | 11,347.5 | Sq.m | 48 ₹5.4 L | 40 ₹4.5 L | 44 ₹5.0 L | 43 ₹4.9 L |
| 2.00 | Resetting of damaged Coursed rubble masonry all-round the large well with hard stone in cement mortar (1:6) (1 cement: 6 coarse sand). Including cost and conveyance of materials, labour charges etc., complete as directed by the site in-charge.. | 17.23 | Cu.m | 11,300 ₹1.9 L | 13,000 ₹2.2 L | 11,100 ₹1.9 L | 11,070 ₹1.9 L |
| 3.00 | Pointing to CR stone dwarf wall masonry all-round the large well with cement mortar (1:4). Including GST etc., complete as directed by the site in-charge. | 277.84 | Sq.m | 350 ₹97,244 | 950 ₹2.6 L | 280 ₹77,795.20 | 250 ₹69,460 |
| 4.00 | Coping over the dwarf wall with PCC (1:2:4) using 20mm HBG metal. including cost, conveyance of all materials, labor charges for head loads, loading and un loading, conveyance charges, placing, curing charges of concrete, GST and all other applicable taxes etc., complete as directed by the site in-charge. | 13.79 | Cu.m | 10,400 ₹1.4 L | 8,500 ₹1.2 L | 10,000 ₹1.4 L | 9,970 ₹1.4 L |
| 5.00 | MS Grill fencing over the dwarf wall all-round the well by using 50X50X6mm 'L' Angle as vertical post, and 20X5mm MS Flat for Horizontal frame @top and bottom, and 20mm M S Square bars @ 20 Cm intervals. Including Design, fabrication and fixing the grill to the vertical posts and fixing the vertical posts into the masonry including cost of materials, Labour charges and conveyance etc., complete as directed by the site in-charge. | 96.9 | Sq.m | 6,700 ₹6.5 L | 4,500 ₹4.4 L | 6,640 ₹6.4 L | 6,630 ₹6.4 L |
| 6.00 | Enamel painting two coats over a primary coat of red oxide including cost, conveyance of all materials, labour charges etc., complete as directed by the site in-charge. | 91.9 | Sq.m | 550 ₹50,545 | 650 ₹59,735 | 440 ₹40,436 | 420 ₹38,598 |
Tender Value
₹15.2 L
EMD Value
₹38,061
Closing Date
27 Nov 2025, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2025_ASI_884438_1
39/NIT/2025-2026/Amaravati/ Anantapur sub Circle
Open Tender
Civil Works
90 days
Ratnagiri
As per Tender document
3 documents required · 3 mandatory
₹0
₹38,061
Yes
16 Dec 2025
6 Nov 2025
28 Nov 2025
6 Nov 2025
27 Nov 2025
6 Nov 2025
Amount
Deracinating, uprooting, plucking out and felling dense/medium/normal jungle /vegetation growth, shrubs, rank vegetation, grass, brushwood, trees and saplings of any girth including removal of roots up to a depth of 60 cm from the ground level or 30 cm from the structures without disturbing the adjoining structural members and protecting the structures from any type of damages, refilling the holes / hollows/ ground area formed by digging for uprooting tree &stumps with earth/stones well rammed, refilling the cavities arising out of the trees removed from the fort/structure with same members if available at site so that the surface at these points confirm not allowing to re-grow of trees from the roots if any remains in the core/ground, pruning of wood, branches, twigs of any trees if any, applying weedicide if any, stacking all useful trunks/logs/materials arising out from the cleaning and grabbing operations, disposing all unserviceable materials far away or fired in piecemeal, including the cost of tools, scaffolding, equipment etc., complete as directed by the site in-charge.
Resetting of damaged Coursed rubble masonry all-round the large well with hard stone in cement mortar (1:6) (1 cement: 6 coarse sand). Including cost and conveyance of materials, labour charges etc., complete as directed by the site in-charge..
Pointing to CR stone dwarf wall masonry all-round the large well with cement mortar (1:4). Including GST etc., complete as directed by the site in-charge.
Coping over the dwarf wall with PCC (1:2:4) using 20mm HBG metal. including cost, conveyance of all materials, labor charges for head loads, loading and un loading, conveyance charges, placing, curing charges of concrete, GST and all other applicable taxes etc., complete as directed by the site in-charge.
MS Grill fencing over the dwarf wall all-round the well by using 50X50X6mm 'L' Angle as vertical post, and 20X5mm MS Flat for Horizontal frame @top and bottom, and 20mm M S Square bars @ 20 Cm intervals. Including Design, fabrication and fixing the grill to the vertical posts and fixing the vertical posts into the masonry including cost of materials, Labour charges and conveyance etc., complete as directed by the site in-charge.
Enamel painting two coats over a primary coat of red oxide including cost, conveyance of all materials, labour charges etc., complete as directed by the site in-charge.
V SURENDRA NAIDU (BID ID -3324075)
CHINTHADA VENKATA RAO (BID ID -3322556)
LINGAM RAVI KIRAN (BID ID -3320701)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.61 MB
BOQ_929604.xls
BOQ • 0.31 MB
39SignedNIT.pdf
Additional Documents • 13.60 MB
Cover1.pdf
Additional Documents • 3.51 MB
Download all tender documents and submit your bid