Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance 67D EXECUTIVE PO IZZAT NAGAR SUNCITY VISTAR BAREILLY UTTAR PRADESH 243122 | BAREILLY | UTTAR PRADESH | 243122 | L1 | Accepted-Finance Financial Bid Qualified | |
| 2 | L2₹1.1 L+₹3,050 (2.79%)Accepted-Finance 02 SILI JAGEER PIPLIYA BAHERI BAREILLY UTTAR PRADESH 243202 | BAREILLY | UTTAR PRADESH | 243202 | L2 | Accepted-Finance Financial Bid Qualified | |
| 3 | L3₹1.3 L+₹18,300 (16.8%)Accepted-Finance 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | L3 | Accepted-Finance Financial Bid Qualified | |
| 4 | Not Admitted-Fee/PreQual/Technical 368 JOGIYABARI HARIHARPUR BEDAULI SADAR MIRZAPUR UTTAR PRADESH 231001 | MIRZAPUR | UTTAR PRADESH | 231001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
17 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E., E.T.D., Bareilly
Hydle Colony, Rampur Garden, Bareilly
Pilfer Proofing Metering of 33KV Mega Food bay at 132KV Substation Richha under ETD, Bareilly
2022_UPTCL_671991_1
Short Term E-Tender No / 13 /ETD / (B) /2021-22
Open Tender
Electrical Works
Item Wise
15 days
Baheri
Please Refer In Tender Documents
2 documents required · 2 mandatory
₹590
Ac No 0043002100037996, IFSC PUNB0004300
₹2,000
22 Feb 2022
6 Jan 2022
18 Jan 2022
6 Jan 2022
17 Jan 2022
6 Jan 2022
120 days
Amount
Providing & Laying of following sizes G.I. Pipes from CT/PT Junction Boxes in switchyard to metering cubicle box in control room. Laying of control cable through G.I. Pipe as per cable schedule on cable rack along the wall of cable trenches as per site requirement alongwith associated work such as Cutting, making Threads for fitting Socket, Elbow & dressing etc. Determination of all internal connections at each equipment,laying of Control Cables in G.I. Pipes and its Retermination including all internal connection at each equipment including correct Ferruling as per drawing on each core of cable. Control cable will be fully covered by G.I. Pipe up to termination point at both ends. All required material (G.I. Pipe, Socket, Bands, Nipples & T-joints), labour,
Pilfer Proofing by using 1 1/2 " Dia Pipe.
Pilfer Proofing by using 1" Dia Pipe.
LASHANI ENTERPRISES
Bharat Trading Corporation
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .