Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAccepted-AOC MAZUMDAR PARA HOUSE NO CITY TOWN HAILAKANDI P O PARCHGRAM P S P ARCHGRAM DISTRICT HAILAKNDI PIN 788802 | HAILAKANDI | ASSAM | 788802 | ₹61.0 L | L1 | Accepted-AOC Being the lowest bidder |
| 2 | L2₹61.0 LRejected-AOC | ₹61.0 L | L2 | Rejected-AOC Not being the lowest bidder |
| Sl No | Description | Qty | Unit | Sri Hirakjyoti Paul L2 | RAUNAQ CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | (1) SH Road(CR Avenue Point) to Ramnagar NH Byepass Point from Ch.0.00m to Ch.450.00m Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, woodwork, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete | 154.61 | Cum | 473.03 ₹73,135.17 | 473 ₹73,130.53 |
| 2.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the inter stices of coarse aggregate,watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means | 142.93 | Cum | 4,873.44 ₹7.0 L | 4,873 ₹7.0 L |
| 3.00 | Providing and laying interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm asper technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints | 1,905.78 | Sqm | 1,222.73 ₹23.3 L | 1,222.7 ₹23.3 L |
| 4.00 | (2) CR Avenue(NH Byepass) from Ch.0.00m to Ch.3500.00m in stretches Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, woodwork, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete | 147.59 | Cum | 473.03 ₹69,814.50 | 473 ₹69,810.07 |
| 5.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the inter stices of coarse aggregate,watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means | 138.37 | Cum | 4,873.44 ₹6.7 L | 4,873.44 ₹6.7 L |
| 6.00 | Providing and laying interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm asper technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints | 1,844.88 | Sqm | 1,222.73 ₹22.6 L | 1,222.7 ₹22.6 L |
Tender Value
₹61.0 L
EMD Value
₹1.2 L
Closing Date
19 Jan 2026, 3:00 pmClosed
The SE, PWD(Roads) Cachar Circle, Silchar.
O/o The SE, PWD(Roads) Cachar Circle, Silchar.
Recovery and reconstn of 1) SH Rd(CR Avenue Pt) to Ramnagar NH Byepass Pt from Ch.0.00m to Ch.450.00m,2) CR Avenue(NH Byepass) from Ch.0.00m to Ch.3500.00m in stretches under NDRF(PDNA-2022) for the yr 2025-26, P/No.SE/SIL/NDRF(PDNA-2022)/25-26/3
2026_PWD_49807_3
T/CC/ETN/SIL/2025-26/935(T)
Open Tender
Civil Works – Roads
210 days
Cachar District.
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,220
₹1.2 L
Yes
O/o The SE, PWD(Roads) Cachar Circle, Silchar.
8 Mar 2026
2 Jan 2026
19 Jan 2026
2 Jan 2026
19 Jan 2026
2 Jan 2026
2 Jan 2026 - 8 Jan 2026
8 Jan 2026
(1) SH Road(CR Avenue Point) to Ramnagar NH Byepass Point from Ch.0.00m to Ch.450.00m Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, woodwork, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the inter stices of coarse aggregate,watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means
Providing and laying interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm asper technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints
(2) CR Avenue(NH Byepass) from Ch.0.00m to Ch.3500.00m in stretches Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, woodwork, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the inter stices of coarse aggregate,watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.By Manual Means
Providing and laying interlocking concrete block pavement with M40 grade of concrete blocks having thickness 80mm asper technical specification clause 1504 complete including carriage. a) Including Edge block/ Edge restraints
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
FOB.pdf
Tender Documents • 0.75 MB
DNIT.pdf
Tender Documents • 3.53 MB
SBD.pdf
Tender Documents • 15.46 MB
BOQ_79176.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid