Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 CrAccepted-AOC 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | ₹3.0 Cr | 1 | Accepted-AOC As L1 bidder |
| 2 | 2₹3.0 Cr+₹4.6 L (1.55%)Rejected-AOC VILL ADISAPTAGRAM PO MOGRA | ₹3.0 Cr+₹4.6 L (1.55%) | 2 | Rejected-AOC As L2 bidder |
| 3 | Rejected-Technical NETAJI SUBHAS PALLY DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | HANSESWARI CORPORATE MANPOWER MANAGEMENT LIMITED L2 | OM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Supply of unskilled workman [01 no. Listed worker for 10 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category I.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category I. | 10 | Months | 33,245.27 ₹3,32,452.7 | 32,245 ₹3,22,450 Lowest |
| 2.00 | Supply of unskilled workman [21 nos. Listed worker (19 heads for 48 months, 01 head for 19 months & 01 head for 21 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category II.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category II. | 496 | Months | 32,480.31 ₹1,61,10,233.76 | 32,480 ₹1,61,10,080 Lowest |
| 3.00 | Supply of unskilled workman [01 no. Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category III.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category III. | 24 | Months | 25,561.92 ₹6,13,486.08 | 25,561 ₹6,13,464 Lowest |
| 4.00 | Supply of unskilled workman [02 no. Non-Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category IV.
Note: - (i) In case of absent from duty by any worker on working day or enjoying E.L (Max. 15 days/head/year) or enjoying listed Holiday (Max. 7 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including ESI, PF, Bonus, O.T., EL, listed Holiday, House rent allowance and others allowance are included in rates.
Category IV. | 48 | Months | 21,309.65 ₹10,22,863.2 | 21,309 ₹10,22,832 Lowest |
| 5.00 | Service Charges on labour cost against engaged workers Category I-IV | 1 | LUMPSUM | 12,00,000 ₹12,00,000 Lowest | 13,46,222 ₹13,46,222 |
| 6.00 | Cost of Tools & Tackles on labour cost against engaged workers Category I-IV | 1 | LUMPSUM | 1,80,790.34 ₹1,80,790.34 | 1,70,790 ₹1,70,790 Lowest |
| 7.00 | Annual Cost of PPE (on reimbursement basis at actual) for 23
Nos Listed workers. For each worker; soap (06 nos. per
month), Duster (04 nos. per year), Helmet(01 no / 2
year), Safety shoe (01 No/2 year), Gumboot (01 pair / year),
Hand gloves (01 pair per month), Nose guard (02 nos. per
month) to be supplied in consultation with Fire & Safety
Deptt. HR & A Deptt., and Utilizer Deptt. BTPS.
(The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety
standard applicable within factory area) | 1 | LUMPSUM | 2,63,120 ₹2,63,120 | 2,53,120 ₹2,53,120 Lowest |
| 8.00 | Annual Cost of PPE (on reimbursement basis at actual) for 02
No Non-Listed workers. For each worker; Helmet (01 no / 2
year), Safety shoe (01 No/year), Gumboot (01no. /year),
Hand gloves (01 pair per month), Nose guard (02 nos per
month) to be supplied in consultation with Fire & Safety
Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
(The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety
standard applicable within factory area) | 1 | LUMPSUM | 15,160 ₹15,160 | 15,140 ₹15,140 Lowest |
| 9.00 | Carriage of mill rejects, other debris like earth, brick bats, stone metals, stone chips, gravels, slag metal, shingles, stone etc. & similar miscellaneous materials, scrap mixed with iron scrap, rubbish, dry leaves, lopped tree branches, grasses, cinder, accumulated ash etc. from bottom ash hopper, coal mill area, ESP area, crusher house 8A-8B, 1A-1B, 11A-11B, guest house, cement go-down, Intake pump house and other different areas inside & outside of plant area and assorted other materials by trucks up to a distance of 5KM. within the plant area including loading in to the truck at the lifting point and unloading at destination (including dressing & carriage by head load 30 Mtr. at each of the two point and sprinkling water during loading, transit & unloading if required including tools & tackles and incidental charges all complete) dumping the same at low lying area of WBPCDL's land completed as per direction of the EIC.
(Measurement will be taken on truck or stack measurement /lorry & usual 1/8th shrinkage will be deducted). The contractor shall have to maintain at his own cost the temporary approach road to different points for plying trucks. | 40,000 | Cubic meter | 190 ₹76,00,000 | 180 ₹72,00,000 Lowest |
| 10.00 | Carriage & removal of Coal reject boulders & big coal from Wagon Tripler area to reject yard and coal yard respectively and coal form Coal Mill area to coal yard or any other area inside & outside of plant premises as per direction of EIC including tools & tackles and incidental charges all complete.
Distance carried not exceeding 5 km. | 18,000 | metric tonne | 160 ₹28,80,000 | 150 ₹27,00,000 Lowest |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
2 Jun 2026, 3:00 pmClosed
GM BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin-712503
Removal of Mill rejection, coal dust, debris, earth etc and Disposal of Stone Boulders and Assorted refuses at BTPS
2026_WBPDC_1024524_1
WBPDCL/BTPS/NIT/E2813/26-27
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents
5 documents required · 5 mandatory
₹0
₹3.1 L
Yes
18 Sept 2026
18 May 2026
4 Jun 2026
18 May 2026
2 Jun 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of unskilled workman [01 no. Listed worker for 10 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category I.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category I. | - | Months | 33,245.27 | - |
| 2 | Supply of unskilled workman [21 nos. Listed worker (19 heads for 48 months, 01 head for 19 months & 01 head for 21 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category II.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category II. | - | Months | 32,480.31 | - |
| 3 | Supply of unskilled workman [01 no. Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category III.
Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates.
Category III. | - | Months | 25,561.92 | - |
| 4 | Supply of unskilled workman [02 no. Non-Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually.
Category IV.
Note: - (i) In case of absent from duty by any worker on working day or enjoying E.L (Max. 15 days/head/year) or enjoying listed Holiday (Max. 7 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%.
(ii) Mandays means physical attendance & CL if any & Holiday if any.
(iii) Wages plus benefits including ESI, PF, Bonus, O.T., EL, listed Holiday, House rent allowance and others allowance are included in rates.
Category IV. | - | Months | 21,309.65 | - |
| 5 | Service Charges on labour cost against engaged workers Category I-IV | - | LUMPSUM | 14,46,322.72 | - |
| 6 | Cost of Tools & Tackles on labour cost against engaged workers Category I-IV | - | LUMPSUM | 1,80,790.34 | - |
| 7 | Annual Cost of PPE (on reimbursement basis at actual) for 23
Nos Listed workers. For each worker; soap (06 nos. per
month), Duster (04 nos. per year), Helmet(01 no / 2
year), Safety shoe (01 No/2 year), Gumboot (01 pair / year),
Hand gloves (01 pair per month), Nose guard (02 nos. per
month) to be supplied in consultation with Fire & Safety
Deptt. HR & A Deptt., and Utilizer Deptt. BTPS.
(The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety
standard applicable within factory area) | - | LUMPSUM | 2,63,120 | - |
| 8 | Annual Cost of PPE (on reimbursement basis at actual) for 02
No Non-Listed workers. For each worker; Helmet (01 no / 2
year), Safety shoe (01 No/year), Gumboot (01no. /year),
Hand gloves (01 pair per month), Nose guard (02 nos per
month) to be supplied in consultation with Fire & Safety
Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
(The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety
standard applicable within factory area) | - | LUMPSUM | 15,160 | - |
| 9 | Carriage of mill rejects, other debris like earth, brick bats, stone metals, stone chips, gravels, slag metal, shingles, stone etc. & similar miscellaneous materials, scrap mixed with iron scrap, rubbish, dry leaves, lopped tree branches, grasses, cinder, accumulated ash etc. from bottom ash hopper, coal mill area, ESP area, crusher house 8A-8B, 1A-1B, 11A-11B, guest house, cement go-down, Intake pump house and other different areas inside & outside of plant area and assorted other materials by trucks up to a distance of 5KM. within the plant area including loading in to the truck at the lifting point and unloading at destination (including dressing & carriage by head load 30 Mtr. at each of the two point and sprinkling water during loading, transit & unloading if required including tools & tackles and incidental charges all complete) dumping the same at low lying area of WBPCDL's land completed as per direction of the EIC.
(Measurement will be taken on truck or stack measurement /lorry & usual 1/8th shrinkage will be deducted). The contractor shall have to maintain at his own cost the temporary approach road to different points for plying trucks. | - | Cubic meter | 190 | - |
| 10 | Carriage & removal of Coal reject boulders & big coal from Wagon Tripler area to reject yard and coal yard respectively and coal form Coal Mill area to coal yard or any other area inside & outside of plant premises as per direction of EIC including tools & tackles and incidental charges all complete.
Distance carried not exceeding 5 km. | - | metric tonne | 160 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_2517848.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .