| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-Finance C 116 KORMANCHALNAGAR PILIBHIT ROAD BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹34.8 L | L1 | Accepted-Finance DUE TO LOWER RATE |
| 2 | L2₹34.8 LRejected-Finance | ₹34.8 L | L2 | Rejected-Finance DUE TO HIGHER RATE |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE AS PER ATTACHED DISPOSAL REPORT OF COMMITTEE |
Tender Value
₹34.8 L
EMD Value
₹70,000
Closing Date
20 May 2026, 12:00 pmClosed
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Construction of the road from Madnapur to Badi Simariya, via Rampura Jatan. Development Block Meerganj
2026_REDUP_1145357_20
13/RED/Nivida file Bareilly/E Nivida/2026-27 dated 01-04-2026
Open Tender
Civil Works - Roads
90 days
MEERGANJ BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹70,000
SE RED CIRCLE BAREILLY
1 Jul 2026
5 May 2026
20 May 2026
5 May 2026
20 May 2026
5 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 + 3Km c | 1,066 | cum | 185.25 | ₹1,97,476.5 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 1,303.94 | cum | 82.65 | ₹1,07,770.64 |
| 3 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 60.35 | cum | 198.55 | ₹11,982.49 |
| 4 | Concrete with 4 cm. gauge stone ballast, approved Coarse Sand and cement in proportion of 6 :3 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 280 | 11.2 | cum | 6,804.85 | ₹76,214.32 |
| 5 | First class Brick work in 1:3 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 307 | 93.6 | cum | 5,415 | ₹5,06,844 |
| 6 | Weep Holes in brick masonary with Supply and fixing of 10cm internal dia A.C down pipe everest or charminar make complete with bends with door at top and plain at bottom and grating and including supply of necessary M.S clamps 2.5cm x3mm fixed to walls with and including supply of 15cm long 6mm dia nails all material labour and T&P etc Required for completion of the work and also including repair of plaster pointing etc. If damaged during fixing of the pipe.but with P.V.C pipe (Kisan, supreme or equivalent) 6kg/ per sq.cm Pressure 10cm dia s,no 730B | 15 | Rm | 294.5 | ₹4,417.5 |
| 7 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 8.32 | cum | 3,519.75 | ₹29,284.32 |
| 8 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 14.84 | cum | 5,225 | ₹77,539 |
| 9 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 5 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 84 | Sqm | 206.15 | ₹17,316.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
BOQ_2141313.xls
BOQ • 0.26 MB
20-T2ofMadnapur.pdf
Tender Documents • 4.19 MB
Download all tender documents and submit your bid