| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.4 LAccepted-Finance ALUMVILAYIL HOUSE MELOODE PO ADOOR PATHANAMTHITTA 691523 | ADOOR | PATHANAMTHITTA | KERALA | 691523 | L1 | Accepted-Finance First Lowest |
| Sl No | Description | Qty | Unit | A.K. SANTHOSH KUMAR L1 |
|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||
| 2.00 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 245.86 | sqm | 15 ₹3,687.93 Lowest |
| 3.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 18.52 | cum | 220 ₹4,073.96 Lowest |
| 4.00 | 51.2.3
Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 20.37 | cum | 892 ₹18,171.82 Lowest |
| 5.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 19.58 | cum | 7,050 ₹1,38,046.05 Lowest |
| 6.00 | 50.2.25.1
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 47.49 | cum | 541 ₹25,691.01 Lowest |
| 7.00 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.74 | sqm | 345 ₹16,469.96 Lowest |
| 8.00 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 12.39 | cum | 9,380 ₹1,16,180.68 Lowest |
| 9.00 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 122.79 | sqm | 669 ₹82,148.52 Lowest |
| 10.00 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 75.95 | sqm | 840 ₹63,797.16 Lowest |
Tender Value
₹53.1 L
EMD Value
₹50,000
Closing Date
24 Sept 2026, 2:00 pmClosed
REGIONAL ENGINEER
Kerala State Nirmithi Kendra (KESNIK),Regional Centre, Erezha North, Chettikulangara, Mavelikara
This work consists of inverted T beam and slab for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
2026_KSNK_868851_1
KSNK/TECH/CHK/SVVN-86(R3)/2025
Open Tender
Civil Works - Buildings
Item Rate
180 days
Swathanthra junction, Veliyanadu
REFER NIT
5 documents required · 5 mandatory
₹2,500
₹50,000
Yes
9 Oct 2026
10 Sept 2026
26 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
10 Sept 2026 - 24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 245.86 | sqm | - | - |
| 3 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 18.52 | cum | - | - |
| 4 | 51.2.3
Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 20.37 | cum | - | - |
| 5 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 19.58 | cum | - | - |
| 6 | 50.2.25.1
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 47.49 | cum | - | - |
| 7 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.74 | sqm | - | - |
| 8 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 12.39 | cum | - | - |
| 9 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 122.79 | sqm | - | - |
| 10 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 75.95 | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
AGREEMENT1.pdf
Tender Documents • 0.22 MB
TenderConditions1.pdf
Additional Documents • 0.56 MB
epaymentform1.pdf
Other Document • 0.01 MB
BOQ_1471643.xls
BOQ • 0.42 MB
DATECORRIGENDUM2.pdf
PDF • 0.06 MB
DATECORRIGENDUM1.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .