15 Feb 2024, 11:00 amClosed
AGM(MAT)-C
CORPORATE MATERIALS PD ADMINISTRATION BUILDING FACT UDYOGAMANDAL KOCHI KERALA
Rerouting the 800 NB Raw water pipeline from the Kinfra area to the FACT CD compound, as per tender documents.
2024_FACT_792757_1
04032/2023-2024/E28873
Open Tender
Miscellaneous Works
Item Rate
60 days
FACT COCHIN DIVISION, AMBALAMEDU
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹25,000
Yes
18 Mar 2024
31 Jan 2024
16 Feb 2024
31 Jan 2024
15 Feb 2024
31 Jan 2024
Amount
FABRICATION OF PIPE The scope of work involves transporting 800mm pipe from the FACT- CD store yard to the work site located in front of the FRBL compound. The work also includes fabricating pipe joints, edge preparation, setting, and arc welding of pipe joints. FACT will provide cranes on a suitable schedule without interfering with the company's emergency requirements. Furthermore, FACT will also supply the necessary consumables and power. The contractor will be responsible for transportation.
ERECTION & HOOK UP Pipeline laying and installation in the trench prepared by FACT CD's civil department. FACT will provide crane support on a reasonable schedule without compromising the company's emergency needs.Connect both ends of the newly installed pipeline segement with the existing line. Work involves cutting the existing pipe at both ends as per requirement to join with the new pipe segment, make necessary edge preparation ,fit up and full welding the joints during the water shutdown of the Plant and line up in minimum possible time .
PROTECTIVE COATING The underground pipeline needs to be coated and wrapped for protection. The process involves cleaning the pipe thoroughly by sand/grit blasting, then applying a single coat of epoxy coal tar paint. After that, the pipe should be wrapped with a corrosion-resistant tape of at least 4mm thickness, with each turn overlapping by at least 25%. Both the wrapping and coating materials are the responsibility of the contractor.
C P SAIDHU
MBM ENGG WORKS
M M BABU ENGINEERING CONTRACTOR
K K ANILKUMAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .