Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.6 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | ₹29.6 L Quoted ₹29.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹32.9 L+₹3.2 L (10.7%)Rejected-Finance RAJKOT ROAD AIR FORCE STATION HALWARA 141106 PUNJAB | HALWARA | LUDHIANA | PUNJAB | 141106 | ₹32.9 L+₹3.2 L (10.7%) | L-2 | Rejected-Finance L-2 |
Tender Value
₹32.9 L
EMD Value
₹65,860
Closing Date
5 Nov 2024, 6:00 pmClosed
HQ CWE (AF) Bhisiana
HQ CWE (AF) Bhisiana
MAINTENANCE AND ATTENDING COMPLAINTS OF PASSENGERS LIFTS IN HIGH RISE BUILDING AT AF STATION HALWARA UNDER GE (AF) HALWARA
2024_MES_678963_1
CWE(BHI)/HAL-48/2024-25
Open Tender
Civil Works
Item Rate
365 days
Halwara
As per tender documents
8 documents required · 8 mandatory
₹500
GE (AF) Halwara
₹65,860
Yes
16 Dec 2024
10 Oct 2024
7 Nov 2024
10 Oct 2024
5 Nov 2024
24 Oct 2024
Amount
Schedule 'A', Part - I COMPREHENSIVE MAINTENANCE OF ELECTRICALLY OPERATED LIFTS :- Comprehensive maintenance of electrically operated lifts suitable for serving passenger Lift of capacity as stated below (Total -22 Nos) with electric power operated doors, auto electric levelling device complete all as specified and as directed by Engineer-in-Charge and as per detail given here-in-after :-Make :-M/s Johnson lift Pvt Ltd Lift Ser No. L-F7271 to L-F7292 installed at Halwara :- (i) 08 persons (544 Kgs), Ground + five floor (total Six landings) = 09 Nos (ii) 08 persons (544 Kgs), Ground + four floor (total Five landings) = 02 Nos (iii) 13 persons (884 Kgs), Ground + five floor (total Six landings) = 09 Nos (iv) 13 persons (884 Kgs), Ground + four floor (total Five landings) = 02 Nos Notes :- (i) The above maintenance shall be done through M/S Johnson Lift Pvt. Ltd/ Authorized agency. The lifts installed at site are of make Johnson lift Pvt Ltd Lift bearing Ser No L-F7271 to L-F7292. (ii) The contractor shall have to submit MOU as per format given in particular specifications from M/s Johnson lift Pvt Ltd/Auth agencies and copy of Annual Maint Contract (PLATINUM contract) (with machine Nos of each lift) from OEM as per Para (i) within ten days of acceptance of tender, failing which the contract will be liable to be cancelled. (iii) The Contractor will conclude AMC (Platinum contract) with OEM and copy of the agreement will be submitted to GE before commencement of AMC Platinum Contract and to the Engineer-in-Charge during execution. No payment will be made to contractor without submission of valid AMC Platinum Contract agreement.
(iv) The above maintenance work include complete maintenance of existing lift by regularly and systematically examining, adjusting and fabricating as required for smooth and efficient functioning of the equipment/lift in reliable, safe and efficient manner using latest techniques & expertise consultancy by regularly examining, lubricating and adjusting the mechanical and electrical driving equipment, governor sleeve, shaft assembly, bearing/contact, governor jaws, car & hall mechanical buttons, car & hall position indicators, car direction indicators and all other car and landing signal/fixtures, deflectors, car and counter weight guide rails and buffers etc and replacement of all major/minor defective/spares parts. Cost of replacement of spares/ maintenance items if damaged during AMC period and maintenance items required during AMC period are deemed to be included in the above rates. The spares as specified here-in-after in Sch 'A' Part - 'II' are exclusive of AMC and items of Sch 'A' Part - 'II' are provisional and shall be operated on requirement basis as approved by GE. (v) Note that monthly services will not be paid to the contractor for the buildings which are under any special repairs and/or unoccupied buildings. (vi) The contractor will provide minimum One Mechanic and One Helper fully trained, for emergency break down, to attend and to repair the lift/equipment all as directed by GE/ Engineer-in-Charge. (vii) The contractor will provide additional One Mechanic from OEM during VVIP/VIP visit on prior intimation from GE in writing. (viii) Maintenance system shall be carried out for all days including sunday and closed holiday with minimum One Skilled Technician and One Semi Skilled Worker. (ix) The AMC for item No. 1 shall come into effect, immediately after commencement of work as given in WO No 1. The lifts will be handed over to contractor as it is condition and no claim in this effect will be accepted at any stage.
(x) The cost of all kind of replaced defective parts / spares / control cards / oil / lubricants etc, other than mentioned in Sch A, as and when required to making the lift/elevator fully functional, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. Hence, the bidder is advised to visit the site to assess the quantum of work to be carried out in this contract and quote their rates accordingly. (xi) The comprehensive / preventive / periodical maintenance includes weekly, fortnightly, monthly, quarterly, yearly inspection/testing as per service manual or as per IS standard. The inspection / test report will be submitted to Engineer-in-Charge. (xii) All the complaints are required to be rectified within 24 hrs and the rectification report be submitted to Engr-in-charge . In case of any delay of more than 24 hr, prior information will be given in writing to Engr-in-charge giving out geniune reasons for delay if any otherwise a penalty as specified in PS shall be imposed from his dues as and when becomes due . (xiii) The such complaints which can not be rectified within 24 hrs as certified by GE giving genuine reasons for delay shall be recorded and penalty for such complaints as stated above shall not be imposed. (xiv) The cost of transportation (to and from) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect. (xv) The contractor shall display his and his tradesmen’s / employee’s mobile / contact number in each lift car & at lift lobby time to time. (xvi) The complete records of replaced spare parts, other than mentioned in Sch 'A' Part -'II, will be maintained and will be produced to Engineer-in-charge on weekly basis or as and when asked to produce the same. Each new part of lift must be produced to the Engr-in-Charge before replacement.
Schedule 'A', Part - II
Supply only in replacement of batteries 12 volt, 18 AH, sealed maintenance free, for ARD (Automatic rescue device) complete all as specified and directed.
Supply only in replacement of batteries 12 volt, 2.5 AH, sealed maintenance free, for Alarm system complete all as specified and directed.
Supply only in replacement of cabin fan of sweep 300mm suitable for lifts complete all as specified and directed.
Supply only in replacement of LED down light fitting 12 watt circular type complete all as specified and directed.
M/S SANGA SINGH AND CO (BID ID -3152032)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .