Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹11.2 LAccepted-AOC | 1st | Accepted-AOC Lowest | |
| 2 | 2nd₹11.8 L+₹64,061.44 (5.74%)Accepted-AOC | 2nd | Accepted-AOC 2nd lowest | |
| 3 | 3rd₹11.9 L+₹78,734.71 (7.06%)Accepted-AOC | 3rd | Accepted-AOC 3rd lowest | |
| 4 | 4th₹12.6 L+₹1.4 L (12.8%)Accepted-AOC | 4th | Accepted-AOC highest |
Tender Value
₹13.4 L
EMD Value
₹33,500
Closing Date
19 Jan 2022, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Head Works Sub Division, Peechi
PSM Urgent protection and leak proofing works of RBMC from ch-1/700 Km to 1/900 Km for the year 2021-22
2022_Irrig_466892_1
49/AEE/2021-22
Open Tender
Civil Works - Canal
Item Rate
120 days
Thanipadam
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹33,500
14 Feb 2022
11 Jan 2022
22 Jan 2022
11 Jan 2022
19 Jan 2022
11 Jan 2022
Amount
Canal maintenance
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per the direction of departmental officers at site
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar as per the direction of departmental officers at site
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. as per the direction of departmental officers at site
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more as per the direction of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site
JENSON
THOMAS P A
SHAJI T.J
Bidder Name
JENSON
SHAJI T.J
THOMAS P A
M V Devassy
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_668668.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .