| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance ALAMPUR NODAKHALI | L1 | Accepted-Finance lowest one | |
| 2 | L2₹3.3 L+₹5,115.54 (1.59%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹3.4 L+₹13,737.96 (4.27%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest |
Tender Value
₹3.2 L
EMD Value
₹7,000
Closing Date
19 Sept 2026, 12:00 pmClosed
E.E (C)/BR-XVI
4 DIMOND PARK, JOKA, KOLKATA-700104
DEPLOYMENT OF CONTRACTUAL LABOUR AT DIFFERENT IMMERSION GHATS IN JOKA ( I AND II) OF KMC ( BR-XVI) 2026
2026_KMC_1041278_1
KMC/E.E(C)/BR-XVI /144/008/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
IMMERSION GHATS IN JOKA ( I, II) OF KMC ( BR-XVI
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹7,000
26 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(B). MAINTENANCE WORKS?(11)Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (Payment to be made on length of wall(c) With bamboos of length above 2.40 m. and up to 3.00 m. each | 28.7 | MTR | 1,207 | ₹34,640.9 |
| 2 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?.(10)Bamboo walling made of crushed bamboo or split bamboo or bamboo twigs(kanchis) as directed and tied with necessary stiffners of split bamboo (in pairs) made of 100mm dia. Bamboo fitted and fixed complete (but excluding the cost of supporting frame work) | 40.9 | SQM | 127 | ₹5,194.3 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 1,046 | EA | 269.5 | ₹2,81,897 |
| 7 | Sub Total | - | - | - | - |
| 8 | GST 0% | 1 | Nos. | - | - |
| 9 | CESS 0% | 1 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
TF144008.pdf
Tender Documents • 0.59 MB
BOQ_2556806.xls
BOQ • 0.28 MB
CIVIL_new.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .