Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAdmitted-Finance | ₹29.5 L | L1 | Admitted-Finance |
| 2 | L2₹36.5 L+₹7 L (23.7%)Admitted-Finance | ₹36.5 L+₹7 L (23.7%) | L2 | Admitted-Finance |
| 3 | L3₹42 L+₹12.5 L (42.4%)Admitted-Finance | ₹42 L+₹12.5 L (42.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANUPAM CONSTRUCTION L1 | NIRMANSHILA CONSTRUCTION L3 | BALAKRAM CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Structural steel ,fabrication, rolling, bending,machining,jig assembly drilling, welding and shop fabrication of tapered staircase with hand rails whose bottom dia is approximate 14 feet and top dia is 5 feet and height upto chimney 30 mtr. | 1 | Job Work | 19,00,000 ₹19,00,000 Lowest | 22,50,000 ₹22,50,000 | 21,00,000 ₹21,00,000 |
| 2.00 | NDT testing with test certificate. | 1 | Job Work | 4,50,000 ₹4,50,000 Lowest | 8,00,000 ₹8,00,000 | 7,50,000 ₹7,50,000 |
| 3.00 | Strengthening of monitoring platform 6 feet x 4 feet at 30 mtr height complete with guard rails ,toe plates and structural supports suitable for minimum safe load of 350 kg. | 1 | Job Work | 4,00,000 ₹4,00,000 Lowest | 7,50,000 ₹7,50,000 | 5,00,000 ₹5,00,000 |
| 4.00 | Core cutting of chimney walls, supply and fixing of MS flange, reinforcement, sealing and finishing for sampling port hole at 30 m level complete. | 1 | Job Work | 2,00,000 ₹2,00,000 Lowest | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 |
Tender Value
Refer Docs
Closing Date
18 Sept 2026, 3:00 pmClosed
M.D
CH. DEVI LAL CO-OP. SUGAR MILLS LTD, Gohana
Tender for spiral stair case for the 45 mtr high RCC chimney and other miscellaneous works.
2026_HBC_547063_1
5
Open Tender
Machineries/ Mechanical Engg Items
Works
30 days
Gohana
Please refer Tender documents.
2 documents required · 2 mandatory
₹320
Yes
Exempted
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel ,fabrication, rolling, bending,machining,jig assembly drilling, welding and shop fabrication of tapered staircase with hand rails whose bottom dia is approximate 14 feet and top dia is 5 feet and height upto chimney 30 mtr. | 1 | Job Work | - | - |
| 2 | NDT testing with test certificate. | 1 | Job Work | - | - |
| 3 | Strengthening of monitoring platform 6 feet x 4 feet at 30 mtr height complete with guard rails ,toe plates and structural supports suitable for minimum safe load of 350 kg. | 1 | Job Work | - | - |
| 4 | Core cutting of chimney walls, supply and fixing of MS flange, reinforcement, sealing and finishing for sampling port hole at 30 m level complete. | 1 | Job Work | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_626713.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .