Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance H1 7 8 IT PARK ROAD NO 4 IPIA KOTA RAJ 324005 | KOTA | RAJASTHAN | 324005 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance C 440 1 MIDC TTC INDUSTRIAL AREA TURBHE NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
24 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CSO (Tech)
CGRHQ (West), Worli Sea Face PO, Worli, Mumbai - 400030
Repair of DA no. 4 alternator onboard ICGS Sankalp
2022_ICG_508536_1
344/25/L-01/LTE/21-22
Limited
Miscellaneous Services
Lump-sum
90 days
Mumbai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
25 Feb 2022
16 Feb 2022
25 Feb 2022
16 Feb 2022
24 Feb 2022
16 Feb 2022
16 Feb 2022 - 21 Feb 2022
90 days
L-01. Main stator, rotor and exciter winding of DA No.4 alternator found short circuited and burnt. Alternator windings to be rewounded and system to be proved. Scope of jobs as follows:- (a) De-coupling of alternator with prime mover. (b) Dismantling of alternator and accessories post removal of connection. (c) Removal of defective winding and through cleaning of internal parts. (d) Testing of Rotor, exciter, Rotating diodes, PMG, Drive and Non drive end bearing and repairs as necessary. (e) Rewinding of main stator, rotor and exciter windings. Main rotor both bearing to be changed and RRA to be changed. (f) Balancing of rotor. (g) Varnishing and baking of alternator, recording of insulation. (h) Assembling, coupling with prime mover and alignment. (j) Connection, load test with maximum ship’s load for 02 hrs, voltage control test as per article 0608 of WERCOS and proving of DA for satisfactory operation. Final setting to work and submission of Test report. .
ADITYA ENTERPRISES
SUNSHINE ENTERPRISES
SOlas Marine Services Pvt. Ltd.
stage.html
html • 0.02 MB
finance_568286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .