| 1 | L1₹5.1 LAccepted-AOC KAMRUP ASSAM 781124 INDIA UDYAM AS 16 0006860 | KAMRUP | ASSAM | 781124 | ₹5.1 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | IMPERIAL COOLING SOLUTIONS L1 |
|---|---|---|---|---|
| 1.00 | Servicing of Fire Pumps(Main Pump,Jockey Pump& Diesel Pump)including Dismantling if required,checking,bearings,seals,lubrication,alignment,pressure settings,suction& delivery lines,and operational testing to ensure readiness as per IS standards as per Direction of Engineer-in-charge. | 1 | job | 90,000 ₹90,000 |
| 2.00 | Cleaning,Flushing & Testing of Yard Hydrants and Landing valves including removal of rust,dirt,scale,checking spindle operation,washers,caps,leakage testing and ensuring smooth operation under working pressure.as per Direction of Engineer-in-charge. | 1 | job | 20,000 ₹20,000 |
| 3.00 | Servicing of Hose Reels,Canvas Hoses & Nozzles including cleaning,coupling checks ,rubber washer replacement if required,pressure testing,rewinding,lubrication of moving parts and ensuring operational readinessas per Direction of Engineer-in-charge. | 1 | job | 20,000 ₹20,000 |
| 4.00 | Refilling, Testing & certification of Fire Extinguishers(ABC/CO2/Water type as applicable)including hydrostatic testing (if necessary),refilling with approved extinguishing media,replacement of seals,safety pins,hose pipes and pressure testing as per Direction of Engineer-in-charge. | 21 | nos | 4,428 ₹92,988 |
| 5.00 | Pressure Testing of Fire Fighting Pipeline Network
Including isolation of system, filling, pressurization, leak detection, rectification support and recording of test results as per applicable IS codes as per Direction of Engineer-in-charge | 1 | job | 40,000 ₹40,000 |
| 6.00 | Trial Run, Testing & Re-Commissioning of Complete Fire Fighting System
Including synchronized operation of pumps, hydrants, hose reels, pressure switches and demonstration of system performance to client authority as per Direction of Engineer-in-charge. | 1 | job | 20,000 ₹20,000 |
| 7.00 | Supply & Installation of ISI Marked Landing Valves (63 mm)
Including fixing, threading, gasket replacement, pressure testing and ensuring leak-proof operation complete in all respects as per Direction of Engineer-in-charge | 10 | nos | 2,000 ₹20,000 |
| 8.00 | Supply of Canvas Fire Hoses (63 mm dia)
With male & female instantaneous couplings, conforming to IS 636 Type-A, complete with pressure testing and commissioning as per Direction of Engineer-in-charge | 24 | nos | 3,000 ₹72,000 |
| 9.00 | Supply & Installation of Fire Bucket Stand with Buckets (Minimum 4 buckets per stand) fabricated from MS, painted red, including fixing at designated locations as per Direction of Engineer-in-charge | 2 | nos | 7,500 ₹15,000 |
| 10.00 | Checking, Maintenance & Reactivation of Control Panels Including electrical connections, auto/manual changeover logic, indication lamps, alarms, relays and functional testing of pump automation system as per Direction of Engineer-in-charge. | 1 | job | 30,000 ₹30,000 |
Tender Value
₹5.6 L
EMD Value
₹11,246
Closing Date
27 Mar 2026, 3:00 pmClosed
Execvutive Engineer
Executive Engineer Mechanical Division
Repairing Maintenance Testing and Commissioning of Fire Fighting System at Rabindra Satabarshiki Bhavan Agartala
2026_CEPWD_71625_1
99_EE_DNIeT_MECH_AGT_2526
Open Tender
Electrical Works
180 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹11,246
2 Jul 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Servicing of Fire Pumps(Main Pump,Jockey Pump& Diesel Pump)including Dismantling if required,checking,bearings,seals,lubrication,alignment,pressure settings,suction& delivery lines,and operational testing to ensure readiness as per IS standards as per Direction of Engineer-in-charge. | 1 | job | - | - |
| 2 | Cleaning,Flushing & Testing of Yard Hydrants and Landing valves including removal of rust,dirt,scale,checking spindle operation,washers,caps,leakage testing and ensuring smooth operation under working pressure.as per Direction of Engineer-in-charge. | 1 | job | - | - |
| 3 | Servicing of Hose Reels,Canvas Hoses & Nozzles including cleaning,coupling checks ,rubber washer replacement if required,pressure testing,rewinding,lubrication of moving parts and ensuring operational readinessas per Direction of Engineer-in-charge. | 1 | job | - | - |
| 4 | Refilling, Testing & certification of Fire Extinguishers(ABC/CO2/Water type as applicable)including hydrostatic testing (if necessary),refilling with approved extinguishing media,replacement of seals,safety pins,hose pipes and pressure testing as per Direction of Engineer-in-charge. | 21 | nos | - | - |
| 5 | Pressure Testing of Fire Fighting Pipeline Network
Including isolation of system, filling, pressurization, leak detection, rectification support and recording of test results as per applicable IS codes as per Direction of Engineer-in-charge | 1 | job | - | - |
| 6 | Trial Run, Testing & Re-Commissioning of Complete Fire Fighting System
Including synchronized operation of pumps, hydrants, hose reels, pressure switches and demonstration of system performance to client authority as per Direction of Engineer-in-charge. | 1 | job | - | - |
| 7 | Supply & Installation of ISI Marked Landing Valves (63 mm)
Including fixing, threading, gasket replacement, pressure testing and ensuring leak-proof operation complete in all respects as per Direction of Engineer-in-charge | 10 | nos | - | - |
| 8 | Supply of Canvas Fire Hoses (63 mm dia)
With male & female instantaneous couplings, conforming to IS 636 Type-A, complete with pressure testing and commissioning as per Direction of Engineer-in-charge | 24 | nos | - | - |
| 9 | Supply & Installation of Fire Bucket Stand with Buckets (Minimum 4 buckets per stand) fabricated from MS, painted red, including fixing at designated locations as per Direction of Engineer-in-charge | 2 | nos | - | - |
| 10 | Checking, Maintenance & Reactivation of Control Panels Including electrical connections, auto/manual changeover logic, indication lamps, alarms, relays and functional testing of pump automation system as per Direction of Engineer-in-charge. | 1 | job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_72881.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
DNIT.pdf
Tender Documents • 2.88 MB
BOQ_72881.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid