Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.93Accepted-AOC | ₹0.93 | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.29Rejected-Finance A 3 269 VIBHAV KHAND GOMTI NAGAR LUCKNOW UTTAR PRADESH INDIA | NA | NA | 226010 | ₹1.29 | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹1.40Rejected-Finance | ₹1.40 | L3 | Rejected-Finance L3 Bidder |
| 4 | L4₹1.62Rejected-Finance | ₹1.62 | L4 | Rejected-Finance L4 Bidder |
| 5 | L5₹1.90Rejected-Finance OPP OLD CIVIL COURT NANPURA 51 5TH FLOOR RIVER PALACE WING A OPP OLD CIVIL COURT NANPURA SURAT 395001 GUJARAT INDIA | SURAT | GUJARAT | 395001 | ₹1.90 | L5 | Rejected-Finance L5 Bidder |
| Sl No | Description | Qty | Unit | Hiren A Gandhi And Associates L3 | Abacus Technocrats Pvt. Ltd. L1 | Muralage L2 | TORSION ENGINEERS and CONSULTANTS L4 | sarjan architects and project consultants L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Professional fees for providing comprehensive consultancy services defined in Scope of work, the Terms & Conditions mentioned under Section VII , General terms and Conditions mentioned under Section VIII, and Time schedule under Section IX of the Technical Bid, for Consultancy Services for Designing and Detailed Engineering Design given in the Technical Bid.
Note:
1. The quoted percentage fees shall be inclusive of the cost for Geotechnical Investigation, Survey, Proof Checking of Structural design, Model/ Walkthrough (if any) for the proposed buildings etc, and scope given in the Technical Bid.
2. The quoted percentage fees includes conceptual planning and designing of Multilevel Vehicle Parking as mentioned in detailed scope of consultancy.
3. Multi level vehicle parking estimated cost shall not be a part of the Project cost for calculation of consultancy fees.
4. The schedule of payment of consultancy fees shall be as per the respective paras of technical bid. | 1 | Percentage | 1.4 ₹1.4 | 0.93 ₹0.93 Lowest | 1.29 ₹1.29 | 1.62 ₹1.62 | 1.9 ₹1.9 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
6 Jan 2026, 3:00 pmClosed
Dean (Admin)
Institute for Plasma Research (IPR), Near Indira Bridge, Bhat, Gandhinagar-382428
Comprehensive Consultancy Services including Architectural Civil Structural Plumbing Electrical HVAC Fire Detection Fire Fighting safety Interior ELV Systems Acoustic General Development Soil Investigation works for subject work at IPR Gandhinagar.
2025_IPR_887053_1
IPR/TN/CIVIL-PR/02/2025
Open Tender
Civil Works - Others
Item Rate
1460 days
IPR Campus, Bhat, Gandhinagar
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹3 L
28 Jul 2026
3 Dec 2025
8 Jan 2026
3 Dec 2025
6 Jan 2026
25 Dec 2025
3 Dec 2025 - 14 Dec 2025
Select, Excess (+), Less (-)
Tender Inviting Authority: Dean (Admin)
Name of Work: Providing Comprehensive Consultancy Services including Architectural, Civil & Structural, Plumbing, Electrical, HVAC, Fire Detection, Fire Fighting & safety, Interior, ELV Systems, Acoustic, General Development works, & to make facility in use for Construction of Multipurpose Administrative Block and related allied works at IPR campus Gandhinagar.
Contract No: IPR/TN/CIVIL-PR/02/2025
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder in Percentage (%) (including GST & all taxes) Excise Duty Amount in INR Rs. P GST Amount in INR Rs. P Freight Charges ( Unloading & Stacking) in Rs. P Any Other Taxes in Rs. P Any Other Duties/Levies in Rs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL RATE in Percentage (%) TOTAL AMOUNT Including GST & all Taxes in Percentage (%) TOTAL RATE In Words
1 Professional fees for providing comprehensive consultancy services defined in Scope of work, the Terms & Conditions mentioned under Section VII , General terms and Conditions mentioned under Section VIII, and Time schedule under Section IX of the Technical Bid, for Consultancy Services for Designing and Detailed Engineering Design given in the Technical Bid. Note: 1. The quoted percentage fees shall be inclusive of the cost for Geotechnical Investigation, Survey, Proof Checking of Structural design, Model/ Walkthrough (if any) for the proposed buildings etc, and scope given in the Technical Bid. 2. The quoted percentage fees includes conceptual planning and designing of Multilevel Vehicle Parking as mentioned in detailed scope of consultancy. 3. Multi level vehicle parking estimated cost shall not be a part of the Project cost for calculation of consultancy fees. 4. The schedule of payment of consultancy fees shall be as per the respective paras of technical bid. item1 1 Percentage 0 Excess(+) Full Conversion INR Percentage 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select %
Quoted Rate in Words
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.80 MB
BOQ_932397.xls
BOQ • 0.31 MB
TechnicalBidIPRTNCIVILPR022025.pdf
Tender Documents • 2.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].