Loading…
Loading…
Tender ID
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
28 Apr 2026, 2:00 pmClosed
EO MC NER CHOWK
MC NER CHOWK
Remaining works of previous work C/O Drain /Foot path from Gurudwara to chak ka Gohar
2026_UDDHP_134697_2
E- TENDERING 811-813 DATED 18-04-2026
Open Tender
Civil Works
Percentage
90 days
NER CHOWK
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
EO MC NER CHOWK
₹20,000
23 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
28 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. | 100.8 | Cum | 200.84 | ₹20,244.67 |
| 2 | Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power roller to required gradient and camber including spreading, watering and rolling hiding materials moorum or earth etc. complete
Detail of cost for 1.00 Cumtr. | 18 | Cum | 1,959 | ₹35,262 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | 12 | Cum | 5,493.21 | ₹65,918.52 |
| 4 | Providing and laying in position specified grade of
reinforced cement concrete, excluding the cost of
centering, shuttering, finishing and reinforcement - All
work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 30.6 | Cum | 6,835.69 | ₹2,09,172.11 |
| 5 | Steel work welded in built up sections/ framed work,
including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 5,587.2 | Kg | 110.72 | ₹6,18,614.78 |
| 6 | Centering and shuttering including strutting, propping
etc. and removal of form for Suspended floors, roofs, landings, balconiesand access platform etc. | 180 | sqm | 258.96 | ₹46,612.8 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.07 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
eotenderform.pdf
Tender Documents • 2.34 MB
BOQ_199354.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .