| 1.00 | STRENGTHENING THE ROAD FROM KUMBAKUDI MELA THERU TO RING ROAD IN KUMBAKUDI PANCHAYAT KM 0/0-1/4 Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-1/460 | 1,752 | sqm | 8 ₹14,016 | 4.7 ₹8,234.4 Lowest |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-1/460 | 901.13 | cum | 150 ₹1,35,169.5 | 102.9 ₹92,726.28 Lowest |
| 3.00 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., Km 0/0-1/0 | 120 | cum | 1,000 ₹1,20,000 | 814.35 ₹97,722 Lowest |
| 4.00 | Km 1/0-1/460 | 55.2 | cum | 1,000 ₹55,200 | 814.35 ₹44,952.12 Lowest |
| 5.00 | Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0 | 281.25 | cum | 3,500 ₹9,84,375 | 3,049.93 ₹8,57,792.81 Lowest |
| 6.00 | Km 1/0-1/460 | 129.38 | cum | 3,500 ₹4,52,830 | 3,049.93 ₹3,94,599.94 Lowest |
| 7.00 | Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-1/460 | 5,475 | sqm | 100 ₹5,47,500 | 53.07 ₹2,90,558.25 Lowest |
| 8.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.complete.PCSC with Paver.. KM 0/0 - 1/0 | 3,750 | sqm | 350 ₹13,12,500 | 237.09 ₹8,89,087.5 Lowest |
| 9.00 | Km 1/0-1/460 | 1,725 | sqm | 350 ₹6,03,750 | 237.09 ₹4,08,980.25 Lowest |
| 10.00 | Providing KM Stones White washing lettering etc., complete. (1.65 x 0.45 x 0.15 m ) | 1 | No | 500 ₹500 | 439 ₹439 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
23 Mar 2022, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 3 roads in Thiruverumbur Block in Tiruchirappalli District under Tamil Nadu Rural Road Improvement Scheme 2021-22 Package No.12
2022_RDTN_224081_11
E1/5988/2021 Dated 02.03.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.0 L
DRDA Tiruchirappalli
29 Mar 2022
9 Mar 2022
23 Mar 2022
9 Mar 2022
23 Mar 2022
9 Mar 2022
15 Mar 2022
Amount
STRENGTHENING THE ROAD FROM KUMBAKUDI MELA THERU TO RING ROAD IN KUMBAKUDI PANCHAYAT KM 0/0-1/4 Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-1/460
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-1/460
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., Km 0/0-1/0
Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0
Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-1/460
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.complete.PCSC with Paver.. KM 0/0 - 1/0
Providing KM Stones White washing lettering etc., complete. (1.65 x 0.45 x 0.15 m )
Providing HM Stones White washing lettering etc., complete. (0.75 x 0.23 x 0.1 )
Providing for Name Board painting & Lettering charges etc.,
Provision for Photographic Charges
STRENGTHENING THE ROAD FROM THIRU NAGAR ROAD IN KEELAKURICHI PANCHAYAT KM 0/0-1/0 Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-0/9
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m Km 0/0-0/9
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., Km 0/0-0/9
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/9
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and laying 50mm consolidated thick bituminous macadam using 0.20cum fo 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRCmetal with 37Kgs of bitumen for pre mixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30 ton capacity , conveying the mix by tipper trucks top a versite, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by8-10tonne Vibratory/ Pneumatic Roller to the required density etc.,including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 to CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paver finisher,Vibratory/Pneumatic roller and all other tools and plant required ,including fuel and all other incidental charges etc., complete as per specification
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.complete.PCSC with Paver.. Km 0/0-0/9
Providing KM Stones White washing lettering etc., complete. (1.65 x 0.45 x 0.15 m )
Providing HM Stones White washing lettering etc., complete. (0.75 x 0.23 x 0.1 )
Providing for Name Board painting & Lettering charges etc.,
Provision for Photographic Charges
STRENGTHENING THE ROAD FROM TRICHY-PUDUKKOTTAI ROAD TO BHEL CITY VIA THIRUVALARCHIPATTI IN GUNDUR PANCHAYAT KM 0/0-1/0 Clearing the Scrub jungle including all labour charges for burrying and burning etc., Km 0/0-1/0
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m Km 0/0-1/0
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-1/0
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., Km 0/0-1/0
Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0
Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-1/0
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.complete.PCSC with Paver.. KM 0/0 - 1/0
Providing KM Stones White washing lettering etc., complete. (1.65 x 0.45 x 0.15 m )
Providing HM Stones White washing lettering etc., complete. (0.75 x 0.23 x 0.1 )
Providing for Name Board painting & Lettering charges etc.,
Provision for Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Jayaraman Krishnamoorthy
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TechBid12.pdf
Tender Documents • 0.33 MB
PriceBid12.pdf
Additional Documents • 0.23 MB
BOQ_264912.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .