Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC KERALA KL | ₹6.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-AOC | ₹7.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHAIBU K JOHN L1 | Kuruvilla Mathew L2 |
|---|---|---|---|---|---|
| 1.00DRAIN | |||||
| 1.00 | 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 5.6 | cum | 1,834.08 ₹10,270.85 | 1,925.78 ₹10,784.37 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 39.2 | cum | 441.5 ₹17,306.80 | 463.57 ₹18,171.94 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 5.6 | cum | 9,001.46 ₹50,408.18 | 9,451.53 ₹52,928.57 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 28.13 | cum | 10,457.41 ₹2.9 L | 10,980.28 ₹3.1 L |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 2.39 | tonne | 1,00,926.12 ₹2.4 L | 1,05,972.42 ₹2.5 L |
| 2.00Drain pipe | |||||
| 2.00 | 9.1.1:Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil (i) Upto 3 m depth | 8.4 | cum | 941.83 ₹7,911.37 | 988.92 ₹8,306.93 |
| 2.00 | 9.3.C:Providing and Laying Reinforced Cement Concrete pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.(C) 750 mm dia | 14 | metre | 3,847.05 ₹53,858.70 | 4,039.4 ₹56,551.60 |
Tender Value
₹6.8 L
EMD Value
₹16,881
Closing Date
11 Nov 2025, 6:00 pmClosed
MUNICIPAL ENGINEER
ALAPPUZHA MUNICIPALITY
Project No.507/2025-26-Drain construction on St Sebastian west road in sea view ward
2025_LSGD_818319_1
T18/507/ME/LSGD/AMC/P3/2025
Open Tender
Civil Works - Others
ALAPPUZHA MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,490
Yes
₹16,881
Yes
15 Feb 2026
3 Nov 2025
12 Nov 2025
3 Nov 2025
11 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371418.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1371418.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 2.27 MB
Download all tender documents and submit your bid