Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.1 L+₹4,266 (2.07%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.0 L+₹89,962 (43.7%)Rejected-Finance JOY KRISHNA PUR P S DEBRA SRI SRI RADHE KRISHNA BHAWAN P O MATH BISHNU PUR VILLAGE TOWN VILL JOY KRISHNA PUR CITY MIDNAPORE | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹5,400
Closing Date
27 Feb 2021, 3:00 pmClosed
Executive Engineer, WSP Division, Palakkad
WSP Division, palakkad
Survey and investigation work for distribution network for Karakurussi panchayath
2021_KWA_415725_1
08/20-21/EE/WSP/PKD
Open Tender
Civil Works - Others
Lump-sum
30 days
Karakurussi panchayath
As per NIT
3 documents required · 3 mandatory
₹560
Yes
₹5,400
Yes
16 Jul 2021
16 Feb 2021
1 Mar 2021
16 Feb 2021
27 Feb 2021
16 Feb 2021
16 Feb 2021 - 25 Feb 2021
Amount
Surveying and investigation of distribution network using Total station and DGPS instrument for a length of minimum 100Km or cover the entire roads in Karakurussi panchayath whichever is higher
Topographical survey of pipeline network using DGPS instrument with following conditions Final drawings in autocad dwg, dxf formats and original total station output shall be supplied in addition to hard copy 3 sets in suitable scale. Every distinct type of parameter shall be in separate layer. ( e.g. Road center, culvert, road BT edge, annotations etc), Road line shall be in a separate layer. No other entry shall be made in that layer. Road line shall be 3D polyline from junction to junction. Closed loops shall terminate on already marked vertices, The maximum closing error shall be within 10 cm,Every vertex shall indicate spatial, three imensional coordinate system. Road line shall be compatible for use in watercad, GIS or similar software.Survey shall be done with georeference. Alignment with GIS database such as Google maps shall be confirmed. Bench marks shall be established at major junctions and KWA installations. Reference level shall be MSL.Pilot drawings shall be given after 10 km initial survey to ensure compliance.All radiant nformation’s such as name of junction, land mark etc. shall be marked clearly in the sketch. All distance measurement shall be annotated in single digit precision and all vertical level shall be of double digit precisions.The main trunks shall be surveyed and close with utmost care and the closing error shall be within 5 cm.Levels of all tips and dips shall be clearly marked. In addition to the above conditions, you are directed to include the peak points of all hills in the survey irrespective of road access The payment will be made only after random checking of levels
RITECH SURVEYING AND ENGINEERING LLP
LOKANATH CONSTRUCTION AND SURVEY ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .