Tender Value
₹12.7 L
EMD Value
₹25,000
Closing Date
3 Sept 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O R.wall in PCC at RD 0.855 to 0.865 and 3.220 to 3.240
2026_PWD_142232_1
PW/RMP/TA/2026-6926 dated 25.08.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
Yes
₹25,000
Yes
28 Aug 2026
28 Aug 2026
3 Sept 2026
28 Aug 2026
3 Sept 2026
28 Aug 2026
28 Aug 2026 - 3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 122.1 | Per cubic meter | 559 | ₹68,253.9 |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement : 4 sand :8 Graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in breast and retaining walls etc. including carriage of material within all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. | 178.8 | Per cubic meter | 6,300 | ₹11,26,440 |
| 3 | Providing weep holes in brick masonry/stone masonry plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including all leads and lifts as per directions of Engineer-in charge. | 45 | Each | 434.77 | ₹19,564.65 |
| 4 | Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 30.6 | Per cubic meter | 1,882 | ₹57,589.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_211253.xls
BOQ • 5.50 MB
SBD.pdf
Tender Documents • 2.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .