Loading…
Loading…
Tender Value
₹11.4 L
EMD Value
₹12,000
Closing Date
16 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Und Irrigation Division, Jamnagar
AJI-IV WATER RESOURCES PROJECT Providing of Outsourcing Dam Staff for Aji-IV Water Resources Project & Und-II Irrigation Scheme for the year 2026-27.
293101
01 of 2026-27
Open
Civil Works
Jamnagar
8 documents required · 8 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹12,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr. )
Name of work :- Providing of Outsourcing Dam Staff for Aji-IV Water Resources
Project & Und-II Irrigation Scheme for the year 2026-27
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Providing Dam Staff throughout the year for 1612.00 Man 708.00
Dam Security & Other Miscellaneous work as Day
per instruction and direction of Engineer-in-
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 11,41,296=00 Estimated Amount Rs. 11,41,296=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Executive Engineer
Signature of Contractor Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
7.pdf
BOQ.pdf
Tender Notice No.1.pdf
Download all tender documents and submit your bid