Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -43.50% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance | -37.87% | ₹6.2 L | L2 | Admitted-Finance |
| 3 | L3₹6.5 LAdmitted-Finance GHAGWAL NONATH TAGOTRA MOHALLA GHAGWAL GHAGWAL KATHUA JAMMU KASHMIR 184141 | SAMBA | JAMMU AND KASHMIR | 184141 | -34.93% | ₹6.5 L | L3 | Admitted-Finance |
| 4 | L4₹6.6 LAdmitted-Finance | -34.30% | ₹6.6 L | L4 | Admitted-Finance |
| 5 | L5₹6.7 LAdmitted-Finance | -32.76% | ₹6.7 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
16 Jan 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer
AS Boq
2026_RDPR_299751_21
e-NIT No- 137REW Samba of 2026 Dated-02-01-2026
Open Tender
Civil Works
60 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹20,000
21 Jan 2026
3 Jan 2026
17 Jan 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with size 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.
Supplying and filling of stone
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
steel work in built up tubular tresses etc incl.cutting,bending and applying coat of steel primer complete type tubes
structural steel work in built up sections tresses framed work etc incl.cutting,bending and applying coat of steel primer all complete twelded
providing fixing galvanized iron sheets 0.50mm complete
cement conc.flooring 1:2:4 finished with coat complete 40mm thick with 20mm stone agg
Carriage of sand upto a lead of 5 Km by MT
Carriage of bajri upto a lead of5 Km by MT
Carriage of stone upto a lead of5 Km by MT
add cost of sign board
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_972574.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid