| 1 | 1₹9.7 CrAccepted-AOC | ₹9.7 Cr | 1 | Accepted-AOC L1 |
Tender Value
₹8.8 Cr
EMD Value
₹2 L
Closing Date
24 Nov 2023, 3:00 pmClosed
SUPERINTENDING ENGINEER
PH CIRCLE, KWA, MALAPPURAM
JJM -Urakam Panchayath -Package-2 -Construction of 6m dia RW well cum pump house 4 MLD WTP 2 nos OHSR Supply and erection of raw water and clear water pump sets and allied electrical works -Pipeline Work
2023_KWA_621588_1
SE/PHC/MPM/190RE/2023-24
Open Tender
Civil Works - Water Works
Item Rate
545 days
Urakam
Refer tender documents
8 documents required · 8 mandatory
₹11,025
₹2 L
PH CIRCLE, KWA, MALAPPURAM
30 Mar 2024
13 Nov 2023
25 Nov 2023
13 Nov 2023
24 Nov 2023
16 Nov 2023
15 Nov 2023
Amount
construction of well
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
100.3.5.1:Earthwork in open well excavation (above water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking.
100.3.5.2:Earthwork in open well excavation (above water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.5m to 3.0m including neat banking.
100.3.5.13:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3.0m to 4.5m including neat banking.
100.3.5.14:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking.
100.3.5.15:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 6.0m to 7.50m including neat banking.
100.3.5.16:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 7.50m to 9.0m including neat banking.
100.3.5.17:Earthwork in open well excavation (in or under water) for wells of diameter above 3.5m and up to 6.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 9.0m to 10.50m including neat banking.
100.4.9:Granite rock blasting in wells, measured in solids, including collecting and stacking spoil for measurement within the initial lead of 50m and lift up to 6.0m (4.5m to 6.0m) but excluding bailing out water and including providing protection by earth filled cement bags (300 Nos. of earth filled cement bags / 10 m3 blasting) to avoid damages to the nearby structures)
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
10.7:Providing and fixing ball bearing for rolling shutters.
10.10.1:Fixing standard steel glazed doors, windows and ventilators in walls, including fixing of float glass panes with glazing clips and special metal-sash putty of approved make, or metal beading with screws, (only steel windows, glass panes cut to size and glazing clips or metal beading with screws, shall be supplied by department free of cost.Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 ( 1 Cement : 3 coarse sand: 6 graded stone aggregate 20 mm nominal size).
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
11.38:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of Ist quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 Coarse sand), including pointing the joints with white cement and matching pigments etc., complete.
intake channel
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
approach bridge
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
OD141081/2022-2023:40 mm GI pipe
Construction of 5.30, LL capacity OHSR at venkulam
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
50.6.1.3:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure above floor two level up to floor V level thickness 20cm and above in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
13.22:Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof.
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
OD141079/2022-2023:40 mm GI pipe
OD141080/2022-2023:supplying and fixing of wall casting pipe wall casting pipe
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete.
100.41.33:Supplying and fixing 500mm dia C.I. manhole cover with frame (medium duty) charges including all cost, labour charges etc., complete.
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
OD199663/2022-2023:Supplying and fixing 150mm DI Vent cowl
OD107773/2023-2024:Fabricating, supplying and fixing water level indicator for Tank/sump 3.0m long using 30x30x5 mm MS angle frame work, graduations are marked on hylam sheet using weather proof stickers, moving MS plate indicator with reflective stickers, counter weight ball in perforated PVC pipe 140mm size connected with plastic twine running through brass pulley and all arrangements are enclosed in casing pipe etc complete.
OD107799/2023-2024:Supplying and fixing Lightning Arrestor including lightning conductor of GI 7/10” SWG (10mm) diameter<br>standard wire with lightning rod of 25mm diameter, 0.9 meters long with earth electrode 25mm diameter,<br>2.75 meters long GI pipe from ground level connecting 50mm diameter, 1.40 meters long perforated GI<br>pipe including fixing of clamps as per IS:2309. fixing all accessories etc complete.as per the directions of electrical inspectorate.
21.1.2.2:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron)
21.2.1:Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS : 12823 Grade I Type II, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of Engineer - in- Charge.Pre-laminated particle board with decorative lamination on one side and balancing lamination on other side
21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
10.7:Providing and fixing ball bearing for rolling shutters.
construction of valve chamber
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Installation of raw water VT pumbsets (Supply and erection of VT pump sets at raw water pump house)
Construction of 2.00 LL OHSR at Madona
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting)
2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited)
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
50.6.1.3:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure above floor two level up to floor V level thickness 20cm and above in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
OD141117/2022-2023:40 mm GI pipe
OD141118/2022-2023:supplying and fixing of wall casting pipe wall casting pipe
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
OD141119/2022-2023:Supplying and fixing Lightning Arrestor including lightning conductor of GI 7/10” SWG (10mm) diameter<br>standard wire with lightning rod of 25mm diameter, 0.9 meters long with earth electrode 25mm diameter,<br>2.75 meters long GI pipe from ground level connecting 50mm diameter, 1.40 meters long perforated GI<br>pipe including fixing of clamps as per IS:2309. fixing all accessories etc complete.as per the directions of electrical inspectorate..
OD141120/2022-2023:Fabricating, supplying and fixing water level indicator for Tank/sump 3.0m long using 30x30x5 mm MS angle frame work, graduations are marked on hylam sheet using weather proof stickers, moving MS plate indicator with reflective stickers, counter weight ball in perforated PVC pipe 140mm size connected with plastic twine running through brass pulley and all arrangements are enclosed in casing pipe etc complete.
OD141121/2022-2023:Supplying and fitting CI Vent cowl with providing moisture proof arrangements.
100.41.33:Supplying and fixing 500mm dia C.I. manhole cover with frame (medium duty) charges including all cost, labour charges etc., complete.
Construction of 2.00 LL OHSR at Madona Construction of valve chamber
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Tank inter connection works
18.73.2:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :150 mm dia Ductile Iron Double Flanged
18.73.4:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :250 mm dia Ductile Iron Double Flanged
18.73.5:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :300 mm dia Ductile Iron Double Flanged
100.31.2.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class II.
100.31.2.6:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 250mm diameter, Class II.
100.31.2.7:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 300mm diameter, Class II.
18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited.
supply and erection of clear water pumsets
OD141094/2022-2023:Supply, erection, testing and commissioning of KWA pre-qualified reputed make Vacuum pump set- 5HP, including suitable fully automatic star delta starter with air break contactors, suitable capacity XLPE cable and connection to the LT panel, earthing etc complete
OD108402/2023-2024:Supply, erection, testing and commissioning of APFC Panel suitable for connecting 4 Nos. 20hp (2 Nos spare), 2 Nos 5hp ( 1 spare) With micro processor based power factor controller and capacitor duty contactors for switching capacitors, heavy duty APP Capacitors, Display for number and capacity of capacitors in service, pf meter to keep the pf between 0.97 and 1.0 including supply and connecting suitable size XLPE cable and earthing.
Supply,erection and commissioning of 315 KVA transformer at raw water pump house and allied works to KSEB
OD75469/2023-2024:Supply,erection, testing and commissioning of 315 KVA, 11KV/433V. 3phase, 50Hz. ONAN cooled , outdoor type copper wound transformers, with HV side bushing and LV side cable entry box arrangements, off load tap changer with 5 tap positions having +5% to -5% variations in 2.5% steps including first filling of oil, earthing etc. complete with all fittings as per IS 2026 and Kerala Electrical Inspectorate standards. Armoured multi core 2.5 Sqmm copper control cables shall be used for all external & internal interconnections . The cost of neutral grounding CT, control cables both internal and external shall be included in the cost of Transformer.
OD75470/2023-2024:Supply of all materials and providing 11 KV sub station yard using 4 Nos. 175 x 85 mm ISMB joist of 9.5 M height, 100 x 50 mm MS chanel cross arms. 2 set of 200A, 11 KV gang operated AB switches with operating handles of required length, 2 sets of 11 KV DO fuses, 2 sets of 6 KA Lightning arrestors, Disc insulators, pin insulators and interconnections of the above items using '0' SWG copper conductor, copper sockets, including all associated civil works and painting of all structures with two coats<br>zinchromate primer and aluminum paint etc complete as per standard construction practices approved by Kerala Electrical Inspectorate and releIvant standards<br>Supply of all materials and providing<br>substation yard fencing using 40 x 40 x 6 mm angle iron frame work of size 1500 x 1800 mm fitted with<br>12 mm iron rode vertically in 10 mm c/c and bolted the same to 75 x 40 x 6 mm vertical chanel erected at<br>1500 mm c/c and 2000 above ground level of substation yard and 500 mm below with 300 x 300 mm plain cement concrete (1:3:6)base using 40 mm granite aggregate and top surface finished neat and including all associated civil works, Supply of all materials and providing 2000mm wide 2500mm height weld mesh gate made out of 50 x 50 x 6mm Angles with necessary foundation locking arrangements etc. complete, and painting of all structures with two coats zinchromate primer and aluminium paint etc. complete as per standard construction practices approved by Kerala Electrical Inspectorate and relevant standards including supply and spreading of granite metal of 40mm size to a height of 10 cm above ground over a 5cm layer of river sand in the entire yard area with side curb protection using cement brick
OD75472/2023-2024:11 KV Metering Unit Supply,erection, testing and commissioning of out door type metering unit consisting of the following accessories: Current Transformer CT Ratio 20/5 A( actual ratio may be decided after calculating connected load& maximum demand) Burden 15VA Accuracy class 0.2S Potential Transformer PT ratio 11KV/110V Burden 100 VA, Accuracy class 0.2 The rate shall include the cost of testing the equipment at KSEB and all other incidental expences. The CT ratio should be fixed only after obtaining the power allocation from KSEB.
OD75474/2023-2024:Supply,erection, testing and commissioning of TOD meter with maximum demand in KVA suitable for the above out door metering set housed in a weather proof out door Kiosk.TOD meter shall be as per the specification of KSEB in force. The rate shall include the cost of testing the equipment at KSEB and all other incidental expences.
OD75475/2023-2024:Supply, laying, testing and commissioning of the following size XLPE insulated, PVC sheathed armoured Aluminium conductor cable (1.1kv grade) clamped on wall/ceiling with clamps and saddle clips partly laid in cable tray/partly laid in trench. 3.5 core 300Sq.mm. 1.1kV XLPE AL Cable
OD75476/2023-2024:Supply, laying, testing and commissioning of the following size XLPE insulated, PVC sheathed armoured Aluminium conductor cable (1.1kv grade) clamped on wall/ceiling with clamps and saddle clips partly laid in cable tray/partly laid in trench. 3 core 185 sqmm 1.1kv XLPE Al Cable
OD75477/2023-2024:Supply, laying, testing and commissioning of the following size XLPE insulated, PVC sheathed armoured Aluminium conductor cable (1.1kv grade) clamped on wall/ceiling with clamps and saddle clips partly laid in cable tray/partly laid in trench.
OD75478/2023-2024:Supply of all materials and providing end termination of the following size PVC/XLPE insulated, sheathed armoured Aluminium conductor cable ( 1.1kv grade ) for giving power connections to Transformers, Panel boards etc. complete as per standards. 3.5 core 300Sq.mm. 1.1kV XLPE AL Cable
OD75479/2023-2024:Supply of all materials and providing end termination of the following size PVC/XLPE insulated, sheathed armoured Aluminium conductor cable ( 1.1kv grade ) for giving power connections to Transformers, Panel boards etc. complete as per standards. 3 core 185 sqmm 1.1kv XLPE Al Cable
OD75480/2023-2024:Supply of all materials and providing end termination of the following size PVC/XLPE insulated, sheathed armoured Aluminium conductor cable ( 1.1kv grade ) for giving power connections to Transformers, Panel boards etc. complete as per standards. 4 core 25 sqmm Al XLPE Cable
OD75481/2023-2024:Supply and providing earthing system as per IS Standards and as per the Electrical scheme drawing as approved by the Electrical Inspector for the earthing of substation, transformer, LT Panels, Equipments, Motors and inter connection of earth pits etc including providing sufficient plate earthing etc complete( 1200x1200x12mm CI/GI as earth plate and copper strip shall be used as earth bus)
OD75482/2023-2024:Supply and fixing of 6mm thick chequered plate with required M.S. angle/plate supports over the masonry cable trench at substation and electrical control room. Angle and plate should be painted one coat of primer and two coats of enamel paint as required.
OD75483/2023-2024:Supply and fixing of M.S. angle cable tray for clamping the various sizes of cables in trenches, through walls, & trusses etc. as per KEI standards.
OD76911/2023-2024:Supplying, fixing, testing and commissioning of Lead acid cell battery suitable voltage and capacity according to control voltage of panels and other equipment’s capacity at 10hrs rate of discharge assembled with plante positive and pasted negative plates with inter cell, inter raw, interior connectiors etc. stand and cell insulators, sealed floats, nuts, bolt, washersetc with electrolyte of specific gravity 1.190 and accessories such as voltmeter, Thermometer, Hydrometer, spaners etc with teak wood stand with 3 coats of antiacid paint to accomodate battery.
OD76915/2023-2024:Supplying, fixing, testing and commissioning of automatic twin battery charger (float cum Booster) with distribution board with all instruments and protective devices etc. complete as per standards.
OD76920/2023-2024:Supply and providing the following safety items approved by Kerala Electrical Inspectorate and relevant standards. Rubber Mat, 11KV glove 2set, 11kV Danger Board 3 Nos, Fire bucket with stand, First aid box, Shock treatment chart, 5kg CO2 fire extinguisher 2 nos, DCP fire extinguisher.
OD77435/2023-2024:Charges for Soil resistivity measurement, earthing design, Electrical scheme preparation, coordinating statutory inspections and getting approval and energisation sanction from statutory bodies like electrical inspectorate and KSEBL( fees and other remittances will be made by KWA)
Construction of compound wall around OHSR and WTP compound at Vengulam
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
16.19:Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
10.16.2:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
Construction of 4.00 MLD Water treatment plant,5.30 LL OHSR and allied works-Appendix A-Aerator
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
11.36:Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
Appendix B-Raw water channel
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.5.33.1:Providing and laying in position machine batched and machine mixed design mix M- 20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. All work up to plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
Appendix C-Flash mixer
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
Appendix D -Chemical House (Store),Alum and lime solution Building and tank in
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
11.3.1:Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
21.10:Providing and fixing double glazed hermetically sealed glazing in aluminium window, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant ) etc. as per specifications, drawings and direction of Engineer-in-Charge complete.
21.18:Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & spring type fixing arrangement and making necessary holes etc. for fixing required door fittings, all complete as per direction of Engineer-in-charge ( Door handle, lock and stopper etc to be paid separately)
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
10.7:Providing and fixing ball bearing for rolling shutters.
10.3:Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts,locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer .
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Appendix-E- Flocculator and Clarifier
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
Appendix-F-Filter house
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.83.2:Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile including applying additional coats wherever required to achieve even shade and colour.Two coats
11.41.1:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 500x500 mm.
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
100.55.1:Supplying of 2 to 6 mm and 6 to 12 mm size fine pebble (pebbles shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
100.55.2:Supplying of 12 to 20mm size pebble (pebbles shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc complete and as per CPHEEO specification.
100.55.3:Supplying of 20 to 40 mm pebble (pebbles shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per directions of the department officers etc. complete and as per CPHEEO specification.
100.55.4:Supplying and stacking for measurement of filter sand having effective size 0.45 to 0.70 mm and uniformity coefficient 1.30 to 1.7, of specific gravity in the range of 2.55 - 2.65 and hard and clean, free from clay, dust and other impurities including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification.
OD26387/2023-2024:Provision of anthracite for dual filter media
17.3.1:Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid
17.7.5:Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Angle back wash basin size 600x480 mm with single 15 mm C.P. brass pillar tap
50.17.1.3:Supplying and fixing CP Towel rod 60cm or nearest available length including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Appendix-G-Construction of Wash Water tank at intermediate staging of 5.30LL OHSR, wash water channel from filter out let to waste water tank
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
13.3.1:20 mm cement plaster of mix:1:4 (1 cement : 4 fine sand)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
100.41.33:Supplying and fixing 500mm dia C.I. manhole cover with frame (medium duty) charges including all cost, labour charges etc., complete.
OD22074/2023-2024:Supplying and fixing 150mm DI Vent cowl
OD22075/2023-2024:Fabricating, supplying and fixing water level indicator for Tank/sump 3.0m long using 30x30x5 mm MS angle frame work, graduations are marked on hylam sheet using weather proof stickers, moving MS plate indicator with reflective stickers, counter weight ball in perforated PVC pipe 140mm size connected with plastic twine running through brass pulley and all arrangements are enclosed in casing pipe etc complete.
Appendix-H-Clear Water Sump (1.50 LL)
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
13.5.1:15 mm cement plaster on rough side of single or half brick wall of mix:1:4 ( 1 Cement : 4 coarse sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
100.41.33:Supplying and fixing 500mm dia C.I. manhole cover with frame (medium duty) charges including all cost, labour charges etc., complete.
OD15272/2023-2024:Supplying and fixing 150mm DI Vent cowl
OD15273/2023-2024:Fabricating, supplying and fixing water level indicator for Tank/sump 3.0m long using 30x30x5 mm MS angle frame work, graduations are marked on hylam sheet using weather proof stickers, moving MS plate indicator with reflective stickers, counter weight ball in perforated PVC pipe 140mm size connected with plastic twine running through brass pulley and all arrangements are enclosed in casing pipe etc complete.
Appendix-1 (i)-Compound Wall , Gate ,Road &amp; Landscaping
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.26.3.7:Laying 400mm R. C. Pressure Pipes Class P3 including specials and fittings after conveying them within initial lead carefully lowering into trenches, placing in position ready for jointing including lighting, watching, fixing, caution boards etc., complete (excluding cost of pipe).
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
100.98.73:Supply of RCC Flush Pipe NP3 Class, 400mm Dia.
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Appendix-1(j)-Consruction of waste water tank and waste Water recycling Arrangements
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
13.5.1:15 mm cement plaster on rough side of single or half brick wall of mix:1:4 ( 1 Cement : 4 coarse sand)
13.21:Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
100.41.33:Supplying and fixing 500mm dia C.I. manhole cover with frame (medium duty) charges including all cost, labour charges etc., complete.
OD15411/2023-2024:Supplying and fixing 150mm DI Vent cowl
OD15412/2023-2024:Fabricating, supplying and fixing water level indicator for Tank/sump 3.0m long using 30x30x5 mm MS angle frame work, graduations are marked on hylam sheet using weather proof stickers, moving MS plate indicator with reflective stickers, counter weight ball in perforated PVC pipe 140mm size connected with plastic twine running through brass pulley and all arrangements are enclosed in casing pipe etc complete.
Appendix-1 (k)-Electrical items
OD6030/2023-2024:Electrical Items including Electrification of WTP including Substation , Office building, chemical house,filter house, Clearwater Pump House etc with ISI certified fittings including LED tube, Fan, exhaust fan etc.The electrification for the Pumps and motors of WTP etc ,Proper earthing also has to be provided. Preparation of scheme for approval and other related activities includingtaking electrical connection from KSEB and necessary approvals from Electrical Inspectorate. Cable laying and its connections from Transformer/Panel boards,Fixing copper strip of suitable thickness and width,Lightning arrester with copper strip for isolating the top portions and all electrical works (transformer to plant)with most modern ISI marked materials,LED Tubes, Solar Lights Yard Lighting and other related electrical works etc necessary for WTP.Electrical Items- 8% of Civil works.
Appendix-1 (l)-Mechanical items
OD6031/2023-2024:Mechanical items,Measuring Devises,Controlling Devises,DI Valves,DI Double Flanged pipes,Pipe Fabrication works,Clarifloculator Bridge,Pumps and motors except Clear water Pump sets,Under Laying System,Chlorinator ,pipe and pipe line for Clarifiers to flash mixtures, plumping work in alum ,lime solution tank,pipe and pipe line for back wash tank and allied items,Ladders,Hoisting Mechanism and MS,Aluminum Fabrication works,interconnection with existing raw water pumping main with aerator using 250mm DIK-9 pipe,Flow meter,Supplying conveying and fixing Candy crane 5,3 & 1 tone capacity for lifting Pumps,Chlorine cylinder,using in chemical store Solution mixing mechanism, Screens, flash mixer, agitators, scraping mechanism,chlorine tonner-3nos, Gate valves, blower including stand bye, pipe gallery, Laterals, wash water pumps & pipes, valves,Rate of flow & head loss gauges,laboratory equipments …. Etc... Of Approved Industry standard & quality etc as per the direction of departmental officer all necessary items for working the Water Treatment Plant.
Maintenance work for WTP to Two years
OD141469/2023-2024:Cost of Lime required for a 4.00 Mld Capacity needed for two years - (As per the supply order history of 11.00 MLD capacity of WTP uvk about 12 Km near in the same source)
OD141470/2023-2024:Cost of Chlorine required for a 4.00 Mld Capacity needed for two years
OD141510/2023-2024:Cost of Alum required for a 4.00 Mld Capacity needed for two years - (As per the supply order history of 11.00 MLD capacity of WTP UVK about 12 Km near in the same source)
OD141471/2023-2024:Operating cost of WTP to two years i.e 2 x 365 days
OD141467/2023-2024:Cost of minor repair works to Mechanical equipments
OD141468/2023-2024:Cost of minor repair works to Electrical equipments
providing surge arreaster at RW pumping main
OD6410/2023-2024:Design supply and installation surge arrester suitable for 250 mm DI k9 pipes having a length of 2800 m and discharge of 90 lps at total head of 120m including necessary fabrication charges, cost of specials, labor charges, and cost of material etc to complete
Bidder Name
Muhammed safvan MK
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .