| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
25 May 2021, 6:15 pmClosed
Superintending Engineer, Irrigation North Circle,
Office of the Superintending Engineer, Irrigation North Circle,Cauvery House,Westhill, Kozhikode 673005
ASE Work Construction of Sea wall for a length of 270m at Nangi Koppalam kadappuram in Manjeswaram taluk of Kasaragod district
2021_Irrig_415685_4
SEIE/ET-05/2020-21
Open Tender
Civil Works - Others
Item Rate
365 days
Nangi- Koppalam Kadappuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,600
Yes
₹50,000
Yes
30 Oct 2021
18 May 2021
28 May 2021
18 May 2021
25 May 2021
18 May 2021
Amount
New seawall
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.47 : Unified data for construction of Sea Wall as per Modified Design Suggested by CWPRS Pune - Providing filter of sea wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched toghther pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed and forming the toe to prevent scourage including conveyance and all leads and lifts etc. complete.
60.48 : Unified Data for Construction of sea wall as per modified design suggested by CWPRS Pune- Providing sand cushion over geo fabric filter by depositing and spreading sea sand in suitable layers with all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.49.9 : A.S.E works as per CWPRS DESIGN- Kasaragod- Supplying at site of work granite stones 10 Kg to 80 Kg (75% 10 to 25 Kg ie 5 to 11 Dm3 and 25 % 25 to 80 Kg ie 11 to 34 Dm3 ) and stacking for measurement including cost and conveyance loading and unloading charges all other incidental charges all leads and lifts etc complete.
60.50 : Unified Data for construction of sea wall as per Modified design suggested by CWPRS Pune -Carriage of departmental granite stones 10kg to 80kg , 5 to 34 dm3(75% 10 to 25 kg, 25% 25 to 80kg) in size from stack at site and dumping in position to lines and levels including all leads and lifts etc. complete.
60.51.9 : A.S.E works as per CWPRS DESIGN- Kasaragod- Supplying at site of work granite stones 80 to150 kg(34 to63 dm3) 50%(34 to 48 dm3) 50% 48 to 63 dm3 in size and stacking for measurement including cost conveyance loading and unloading charges all leads and lifts etc complete.
60.52 : Unified Data for Construction of sea wall - as per Modified Design suggested by CWPRS Pune- Carriage of departmental granite stones 80kg to150 kg (34 dm3 to 63dm3) 50% (34 to 48 dm3) 50% ( 48to 63 dm3) in size from stack at site and dumping in position to lines and levels including all leads and lifts etc complete.
60.53.9 : A.S.E works as per CWPRS DESIGN- Kasaragod-Supplying at site of work granite stones of size150 to300 kg(63 to125 dm3) 50% more than 225kg(94dm3) as nearly cubical as possible the minimum dimension in any of the three perpendicular direction passing through the centre of gravity.of each individual stone having not less than 30 cms including loading and unloading charges, marking with distinguishing number on three faces with paint etc complete.
60.54.9 : A.S.E works as per CWPRS DESIGN- Kasaragod-Supplying at site of work granite stones of size 300 to 400 Kg (50% more than 350Kg(146 dm3)as nearly cubical as possible the minimum dimension in any of the three perpendicular direction passing through the centre of gravity of each individual stone having not less than 35 cms including loading and unloading charges, marking with distinguishing number on three faces with paint etc complete.
60.55 : Unified data for construction of sea wall- as per Modified design suggested by CWPRS Pune -Dumping in position ( not to be packed ) Granite stones 150 kg to 300kg(63 to 125 dm3) in size suitably to form the armour course of sea wall as per the approved design ( dumping with a lead up to 50m) using rail track or pneumatic type equipment with cranes or winches or by any other method ( each trip to take 3 minutes and carry 7 stones - 1.6t )
60.57 : Unified data - Construction of sea wall- as per Modified design suggested by CWPRS Pune - Dumping in position (to be packed ) Granite stones 150kg to 300kg (63 to 125dm3) in size suitably to form the armour course of sea wall as per the approved design (dumping with a lead up to 50m) using rail track or pneumatic type equipment with cranes or winches or by any other method (each trip to take 3 minutes and carry 7 stones- 1.6 t
60.56 : Unified Data for construction of sea wall -as per Modified design suggested by CWPRS Pune -Dumping in position (not to be packed) Granite stones 300kg to 400kg (125 to 167dm3) 50% more than 350kg in size suitably to form the armour course of sea wall as per the approved design (dumping with a lead up to 50m)using rail track or pneumatic type equipment with cranes or winches or by any other method (each trip to take 3 minutes and carry 4 stones)
Bidder Name
SHAMEER M A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_599716.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .