Loading…
Loading…
Tender Value
₹16.5 L
EMD Value
₹49,500
Closing Date
3 Sept 2026, 6:00 pm
DEPUTY CONSERVATOR OF FOREST, NORMAL DIVISION, SURAT.
RETROFITTING WORK OF VAN BHAVAN OFFICE BUILDING AT ADAJAN IN SURAT (TOILET BLOCK SIDE)
336655
DCFSUR/TENDER/07/2026-27
Open
Civil Works - Buildings
Works
Surat
3 documents required · 3 mandatory
₹1,000
Deputy Conservator of Forest
₹49,500
20 Aug 2026
20 Aug 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
1 Civil Work
A Total
C Add Contingency Charges 2.25%
D Total A + B + C
Say Total
RETROFITTING WORK OF VAN BHAVAN OFFICE BUILDING AT ADAJAN IN SURAT (TOILET BLOCK SIDE)
SOR Rate 2024-25 SOR Rate 2024-
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
W/o 1% L.C. 25 With 1% L.C.
Dismentaling tiled of stone floors laid in mortar including stacking of
20005) serviceable materilas and disposal of unserviceable materials with all 49.61 0.50 50.11 Smt
lead and lift.
Demolition of Brickwork and stone masonary including stacking of
20003B) serviceable materials and disposal of unserviceable materials with all 572.20 5.72 577.92 Cmt
lead and lift. (ii)In cement mortar
Demolition including stacking of serviceable materilas
20002) and disposal of unserviceable materials with all lead and 1099.75 11.00 1110.75 cu.m
lift. (i) R.C.C. work
Excavation for foundation upto 1.5 m depth including sorting out and
04B001C) stacking of useful materials and disposing off the excavated stuff upto 460.53 4.61 465.14 Cmt
50 Meter lead.(C) Hard Murrum/or any surface
Filling in plinth and foundation with sand under floors including
04007A) watering ramming, consolidating and dressing complete 477.03 4.77 481.80 Cmt
04008A) 20cm. thickness including watering, ramming and consolidating etc. 298.79 2.99 301.78 Cmt
complete. (more than 10 ton)
Filling available excavated earth (excluding rock) in trenches.
plinth, sides of foundations etc. in layers not exceeding 20 cm. in
7 33.00 (SOR ID 4006) 135.56 1.36 136.92 Cmt
depth consolidating each disposited layer by ramming and
Carring out plinth treatment to post construction / existing structure by
spraying chemical solution for termite control treatment including
labour and material consistent with I.S.I specification. Using Chlordane
and Chiorpurfiles 20 EC. As Per 6131_paret-II Concentration Weight
22007) one percent is recommended i.e one liter 20 EC chemical emulsion with 86.17 0.86 87.03 Smt.
19 liter give 1 % concentration inclusive of one liter chemical emulsion
application at the rate of 5 Liter chemical/ Sqm of surface is
recommended as per I.S.
SOR Rate 2024-25 SOR Rate 2024-
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
W/o 1% L.C. 25 With 1% L.C.
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
(SOR ID sand : 4- graded stone aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A) Foundation and Plinth
Providing and laying in position Ready Mixed M-300 grade concrete for
reinforced cement conctere work , using cement content as per
approved Design Mix manufactured in fully automatic batching plant
and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping
#REF! 8.20 R.A.= 1.0 of R.M.C. from transit mixer to site of laying, including the cost of 5647.00 56.47 5703.47 Cmt.
centering shuttering finishing and excluding reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete, improve workability without
impairing strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash (Min cement level as per latest IS 456 shall be
maintained) (Cement level 475 kg )
Providing and fixing temporary steel props/support system to take the
load of the surrounding structure during the repair process, including
necessary staging and removal after completion. complete with all the
12 135.00 MR required tools, tackles, labourers as required and as directed by the 400.00 4.00 404.00 Sqm
engineer in charge. Unit will be in sqm and For measurement, column
Height and Length will be measured.
Chipping of existing concrete surface using mechanical tools to remove
loose/damaged concrete and expose coarse aggregates, including
cleaning the surface with wire brush, removal of dust, debris and
laitance. P/A ANTI CORROSIVE RUST REMOVER ON REIN Providing and
applying anti corrosive rust remover "Rusticide" of M/S Sunanda
speciality coating pvt Ltd or equivalent approved including cleaning 580.00 5.80 585.80 Smt.
the reinforcement bars with wire brush or air blowing including
removing of all loose particle with applying rust remover thoroughly on
reinforcement bars by using cotton waste swab etc. complete with all
the required tools, tackles, labourers as required and as directed by the
engineer in charge.
SOR Rate 2024-25 SOR Rate 2024-
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
Sr. No. Quantity Ref Description of Item 1% Lc. Per / Unit Total Amount
W/o 1% L.C. 25 With 1% L.C.
Drilling holes in existing column using rotary hammer drill and fixing
12 mm dia L-shaped TMT bars as shear connectors in zig-zag pattern
14 900.00 MR at 600 mm c/c on all faces, including cleaning of holes, filling with 195.00 1.95 196.95 Nos
approved epoxy/chemical grout and proper anchorage. complete with
all the required tools, tackles, labourers as required and as directed by
the engineer in charge.
Providing and applying polymer modified mortar treatment in
proportion (Cement : White Sand : SBR = 1 : 1 : 0.14) in layers up to
mm thickness each by hand pressing method over prepared concrete
surface, including surface cleaning and roughening, application of
bonding coat, placing and compacting mortar, finishing to a rough 850.00 8.50 858.50 Smt.
texture to ensure proper bond with subsequent RCC jacketing,
including curing, all materials, labour, tools and equipment complete as
per specification and directed by EIC.
Providing formwork of ordinary timber planking so as to give a rough
finish including centering shuttering strutting and propping etc. Height
(SOR ID of propping and centering below supporting floor to ceiling not 317.52 3.18 320.70 Smt.
exceeding 4M. and removal of the same for insitu reinforced concrete
and plain concrete work in. (G) Columns Pillars Posts and struts
Providing and laying minimum 100 mm thick RCC jacketing around
existing column using design mix M30 micro concrete, including
addition of approved admixtures (superplasticizer) and fiber
reinforcement 3s 12mm fibers (Recron or equivalent),
17 13.30 MR including: 79000.00 790.00 79790.00 Cmt
-Pouring/pumping of micro concrete
-Compaction using vibrator (if applicable)
-Finishing to line and level
The work shall be carried out from foundation level up to required
height (including terrace level if specified).
Providing TMT Bar FE 550D reinforcement for R.C.C.
05014D) work including bending, binding and placing in position 94.05 0.94 94.99 Kg
complete upto floor two level
ESTIMATE-1 MEASUREMENT
ESTIMATE-1
Sr. TE. Height /
Description / Location Unit/ Fl'r No. Length Width Total Qty
No. No. Depth
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas and disposal of
1 unserviceable materials with all lead and lift.
# For Footing
Total =
Smt Say for item No. 1 =
Demolition of Brickwork and stone masonary including stacking of serviceable materials and disposal of unserviceable
2 materials with all lead and lift. (ii)In cement mortar
# Dismantling
# Columns 6 No. 1 0.23 8.75
Total =
Smt Say for item No. 2 =
3 Demolition including stacking of serviceable materilas
Dismantling
Columns 6 No. 0.6 0.3 8.75
Total =
Smt Say for item No. 3 =
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the
4 2 excavated stuff upto 50 Meter lead.(C) Hard Murrum/or any surface
# Additional pad footing
Total =
Cmt Say for item No. 4 =
Filling in plinth with sand under floors including watering ramming, consolidating and dressing complete
# Additional pad footing
Total =
Cmt Say for item No. 5 =
6 3ii and consolidating etc. complete. (more than 10 ton)
# Additional pad footing
Total =
Cmt Say for item No. 6 =
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not
7 3iv exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering.
Excavation Soil Quantity Using Statement
Not For Count
As Per Item No- 1 *
Total excavation (2 To 2iii)
Deduction of Dabris 10 % of
Deduction Westage & Hard stone of 10% of of
-1 Unit * 4.80 10% of of 1351 Cmt. -4.80
Excavation Quantity.
Deduction of footing -1 Unit * 10.30 -10.30
Final calculation For Surplus Earth 32.90 Cmt total Qty.
Total =
Cmt Say for item No. 7 =
ESTIMATE-1 MEASUREMENT
Sr. TE. Height /
Description / Location Unit/ Fl'r No. Length Width Total Qty
No. No. Depth
Carring out plinth treatment to post construction / existing structure by spraying chemical solution for termite control
treatment including labour and material consistent with I.S.I specification. Using Chlordane and Chiorpurfiles 20 EC. As
Per 6131_paret-II Concentration Weight one percent is recommended i.e one liter 20 EC chemical emulsion with
8 4 liter give 1 % concentration inclusive of one liter chemical emulsion application at the rate of 5 Liter chemical/ Sqm of
surface is recommended as per I.S.
# Footing area 6 No. 2.00 2.00
Total =
Cmt Say for item No. 8 =
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal
9 5 size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
Total =
Cmt Say for item No. 9 =
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement conctere work , using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
### 7b including the cost of centering shuttering finishing and excluding reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without
impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as
per latest IS 456 shall be maintained) (Cement level 475 kg )
*1 Ground Floor
Total =
Cmt #REF! =
Providing and fixing temporary steel props/support system to take the load of the surrounding structure during the
repair process, including necessary staging and removal after completion. complete with all the required tools, tackles,
12 labourers as required and as directed by the engineer in charge. Unit will be in sqm and For measurement, column
Height and Length will be measured.
*1 Ground Floor
*1 Total Columns
# 350x750-- Increased size 550x950 6 No. 3 7.50
Total =
Nos Say for item No. 12 =
Chipping of existing concrete surface using mechanical tools to remove loose/damaged concrete and expose coarse
aggregates, including cleaning the surface with wire brush, removal of dust, debris and laitance. P/A ANTI CORROSIVE
RUST REMOVER ON REIN Providing and applying anti corrosive rust remover "Rusticide" of M/S Sunanda speciality
coating pvt Ltd or equivalent approved including cleaning the reinforcement bars with wire brush or air blowing
13 including removing of all loose particle with applying rust remover thoroughly on reinforcement bars by using cotton
waste swab etc. complete with all the required tools, tackles, labourers as required and as directed by the engineer in
Total Columns
Total =
Smt Say for item No. 13 =
Drilling holes in existing column using rotary hammer drill and fixing 12 mm dia L-shaped TMT bars as shear
connectors in zig-zag pattern at 600 mm c/c on all faces, including cleaning of holes, filling with approved
14 epoxy/chemical grout and proper anchorage. complete with all the required tools, tackles, labourers as required and
as directed by the engineer in charge.
ESTIMATE-1 MEASUREMENT
Sr. TE. Height /
Description / Location Unit/ Fl'r No. Length Width Total Qty
No. No. Depth
*1 Total Columns
Total =
Nos\ Say for item No. 14 =
Providing and applying polymer modified mortar treatment in proportion (Cement : White Sand : SBR = 1 : 1 : 0.14) in
layers up to 22 mm thickness each by hand pressing method over prepared concrete surface, including surface cleaning
15 7d and roughening, application of bonding coat, placing and compacting mortar, finishing to a rough texture to ensure
proper bond with subsequent RCC jacketing, including curing, all materials, labour, tools and equipment complete as
per specification and directed by EIC.
*1 Total Columns
Total =
Cmt Say for item No. 15 =
Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting
and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4M. and removal of
16 the same for insitu reinforced concrete and plain concrete work in. (G) Columns Pillars Posts and struts
*1 Total Columns
# 350x750-- Increased size 550x950 6 No. 2 8.30
Total =
Cmt Say for item No. 16 =
Providing and laying minimum 100 mm thick RCC jacketing around existing column using design mix M30 micro
concrete, including addition of approved admixtures (superplasticizer) and fiber reinforcement 3s 12mm fibers (Recron
17 or equivalent),
including:
-Pouring/pumping of micro concrete
*1 Total Columns Thickness
# 350x750-- Increased size 550x950 6 No. 0.95 0.55 8.50
450x450-- Increased size 650x650 -6 No. 0.75 0.35 8.50 -13.39
Total =
Cmt Say for item No. 17 =
Providing TMT Bar FE 550D reinforcement for R.C.C.
18 12 work including bending, binding and placing in position
complete upto floor two level
### For footing * 8.200 * 40.00 Kg/ Cmt 328
For Columns
Bar type Dia Unit Nos L Total Rmt Wt/Rmt KG total
Main 12mm 6 No. * 12.000 * 11.000 * 792.000 0.89
Stirrups 8mm 6 No. * 70.000 * 3.000 * 1260.000 0.39
Total =
Kg. Say for item No. 18 =
Rate Analysis
Rate Analysis S.O.R. Base R & B Division Year 2024-25
Rate Analysis
R.A.= 1 For Item No.
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement conctere work , using cement content as per
approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, including the cost of centering shuttering finishing and excluding reinforcement
including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability
without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS
456 shall be maintained) (Cement level 475 kg )
Assu.Size For Cost 1 * 1.5 * 1.5 * 0.5 = 1.13 Cmt
Particular Qty. Unit Rate Amount
a Concrete M30 (05057) 1.13 Cmt. 5161.90
b Shuttering (09001A) 3.00 Smt 181.91
Total for Labour & material
Total for 1.125 Cmt
Total for 1 Cmt
Say Rs.= 5647.00 Cmt
R.A.= 2 For Item No.
Providing 15mm thick Water proof Cement Plaster in single coat on brick/concrete wall for interior plastering at all floor Lvl. & finished even
and smooth in(i) Cement mortar 1:4 (1-cement :4-sand) For First Floor, etc. Complete, as per detailed and directed by EIC
Assu.Size For Cost 1 * 1 * * 1 = 1.00 Smt
Particular Qty. Unit Rate Amount
a 15mm. Thk. Plaster CM. 1:4 SOR -17002B+17007A(Average) 1.00 Smt. 187.46
b Cement Consumption as per SOR-17005 8.51 Kg. Per Smt. 0.20 Bag 48.77
Total for Labour & material
Total for 1 Smt
Total for 1 Smt
Say Rs.= 197.05 Smt
Rate Analysis Sheet Page: 8 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 SBD.pdf
2.0 BOQ.pdf
3.0 SPECIFICATION INDEX.pdf
3.1 RETROFITTING SPECIFICATION AND METHODOLOGY.pdf
4.0 TSN.pdf
Building Specification Book.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].