| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.6 LAccepted-AOC 194 1 MATA WALA BAGH PURANI TEHSIL ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | L1 | Accepted-AOC L1 | |
| 2 | L2₹78.7 L+₹1.1 L (1.41%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
15 Apr 2023, 2:00 pmClosed
SE
MBD
VRB 7.600
2023_UPIDC_796137_1
02/SE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
180 days
amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
29 Jan 2024
10 Apr 2023
15 Apr 2023
10 Apr 2023
15 Apr 2023
10 Apr 2023
Amount
Earth work in foundation in dry soil (loam clay or sand ) including lift up to 1.5 m and lead up to 30 m and including back filing, watering and raming ofexcavated earth in to the trenches or into the space between or into the plinth with removal and disposal or surplus earth as directed by the engineer - in - charge up to a distance of 30 m from the foundation trenches (as per sor ch 5 item 1 ) and proper complete work.
Plain cement concrete( M-10) 1:3:6 in foundation base concrete including all labour, material T&P etc.
Laying Cement concrete in M-15 1:2:4 in Toewall, Transitions Sleepers Lining etc. including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-25 1:1:2 in Raft wall bridgs, wearing Coat etc. including all costs of T&P material required for proper completion of work.
Centering and shuttering for C.C. works in toe wall, transition including cost of all labour and T&P etc. complete.
Centering and shuttering for R C.C. works in peir abutment including cost of all labour and T&P etc. complete.
Centering and shuttering for Special type of R.C.C. works as curves being bridges syphon flaired wing walls including cost of all labour and T&P etc. complete.
Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete.
S/Laying boulder in Apron including cost of all labour and T&P etc. Complete.
S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete.
Providing Brick on edge pitching including cost of all labour and T&P etc. Complete.
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete.
S/F Fixing Marble Name Plate of Size 300 x 200 x 25 mm including cost of all labour and T&P etc. Complete.
S/Fixing Marble B.M. Plate of Size 150 x 150 x 25 mm including cost of all labour and T&P etc. Complete.
Providing & Fixing wheel guard of size 150 x 150 x 900 including cost of all labour and T&P etc. Complete.
Dismantling of bitumen road from Road including cost of all labour and T&P etc. Complete.
Panting Bitumen in two coat on C.C. Sleepers including cost of all labour and T&P etc. Complete.
Filling up sealing compound or making contraction joint including cost of all labour and T&P etc. Complete.
Providing & Fixing 225 mm wide water stop seal including cost of all labour and T&P etc. Complete.
Earth work for lifting the level of road lead up to VRB Level 100 m lead for filling for approach road including Cost of all labour and T&P etc. Complete.
Earth work Disposal lead up to 1.00 KM including cost of all labor and T&P etc. Complete.
Making of diversion Earth work in filling lead up to 1.00 km. including Cost of all labour and T&P etc. Complete for diversion.
Providing & Laying BOE.Soling on road including cost of all labour and T & P etc. Complete for diversion and approach road.
Making wall & for stopping traffic in M- 100 B/W in 1:6 Cement mortar cost of all labour and T & P etc. Complete for diversion.
Dismantling BOE. Soling from diversion of Road including cost of all labour and T&P etc. Complete.
Dismantaling of brick wall made for stopping traffic in M-100 B/W in 1:6 cement motar cost of all labour and T&P etc. Complete for diversion.
Disposil of earth from the road of diversion including cost of all labour and t&p etc.complete.
Making and fixing sign board at site of work and including cost of all labour and T&P etc. Complete.
Laying ordinary sand soling including cost of all labour and T&P Complete.
J.M.D. Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .