Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.6 L+₹1.1 L (16.6%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical non Responsive |
Tender Value
₹7.2 L
EMD Value
₹14,400
Closing Date
7 Oct 2026, 11:00 amClosed
EE MANDI-II,HPPWD MANDI
EE
Restoration of rain damages on Khadkalyana Dolra Harizan Basti road Km. 0/00 to 6/200. (SH- Construction of Hume pipe structure along with crate wire in Karnal Khad at RD 6/200) Under PDNA 2025
2026_PWD_144701_14
MDII
Open Tender
Civil Works
Item Rate
30 days
EE MANDI-II, HPPWD MANDI
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
Yes
₹14,400
Yes
13 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures for all kinds of soil as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50m (fifty metre), dressing of sides and bottoms and back filling in trenches with excavated suitable material in ordinary soil upto 3m (three metre) depth including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 24 | Per cubic metre | 517.65 | ₹12,423.6 |
| 2 | Providing and laying of boulder apron laid in wire crate with 4mm (four millimetre) dia. GI wire conforming to IS:280 and IS:4826 in 100x100 mm (one hundred into one hundred millimetre) mesh (woven diagonally) including 10 (ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg (twenty five kilogram) each ( wire crate will be supplied by the department free of cost) as per drawing and technical specifications clause 1301 complete within all leads, lifts carriage of material and other incidental complete in all respect as per direction and satisfaction of Engineer-in-Charge. | 172.8 | Per cubic metre | 2,700 | ₹4,66,560 |
| 3 | Providing and laying 900mm dia (nine hundred millimetre) reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement : two sand) but excluding excavation, protection work, backfilling, concrete and masonry work in head walls and parapets Clause 1108 including carriage of materials with in all leads, lifts and other incidentals as per direction of Engineer-in-charge. | 25 | Per running metre | 4,660.7 | ₹1,16,517.5 |
| 4 | Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specifications clause 1204.3.8 Granular material complete within all leads, lifts carriage of material and other incidentals as per direction of Engineer-in-Charge. | 89.86 | Per cubic metre | 1,384 | ₹1,24,366.24 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_215273.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 2.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .