Tender Value
₹4.2 L
EMD Value
₹8,400
Closing Date
14 Aug 2026, 5:00 pmClosed
Rahul Poonia
Municipal Council Gohana
Development works in Shanti Niwas Ashram Sewa Trust in Ward 10 MC Gohana
2026_HRY_539440_1
202655961384 D913 4FED A20B 50D5A587BCEA320ULB
Open Tender
Civil Works
Works
150 days
Gohana
Development works in Shanti Niwas Ashram Sewa Trust
2 documents required · 2 mandatory
₹500
Yes
₹8,400
Yes
31 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.10.1]20 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 425.75 | Sqm | 177 | ₹75,357.75 |
| 2 | [11.3]Neat cement punning. [Through Rate] | 875.44 | Sqm | 29 | ₹25,387.76 |
| 3 | [11.7.1]20 mm cement plaster of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 425.75 | Sqm | 176 | ₹74,932 |
| 4 | [30.9]Regarding terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer-in-Charge. [Through Rate] | 398.02 | Sqm | 219 | ₹87,166.38 |
| 5 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 3.14 | cum | 6,113 | ₹19,194.82 |
| 6 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] | 144.45 | Kg. | 68 | ₹9,822.6 |
| 7 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 6.77 | cum | 3,968 | ₹26,863.36 |
| 8 | [7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 22.45 | cum | 4,488 | ₹1,00,755.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_618698.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .