| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.9 LAccepted-AOC | ₹16.9 L | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹17.4 L+₹49,101.98 (2.91%)Rejected-Finance | ₹17.4 L+₹49,101.98 (2.91%) | 2 | Rejected-Finance L2 bidder |
| 3 | 3₹19.5 L+₹2.6 L (15.6%)Rejected-Finance | ₹19.5 L+₹2.6 L (15.6%) | 3 | Rejected-Finance L3 Bidder |
Tender Value
₹18.8 L
EMD Value
₹37,595
Closing Date
28 Mar 2022, 4:00 pmClosed
EEIII
EE, WDIII,WRD, Ponda-Goa
Improvement of drainage system to the existing Nallah near Bal Bhavan at Aquem, Margao
2022_WRD_3084_1
10/21-22/ACT/WDIII/WRD/898/S1
Open Tender
Miscellaneous Works
Item Rate
90 days
Ponda
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹37,595
25 Apr 2022
14 Mar 2022
29 Mar 2022
14 Mar 2022
28 Mar 2022
14 Mar 2022
Amount
Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varieties shingles, pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling , wedging etc . excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of Side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc.complete a) All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering & shuttering including Strutting, Propping & removal of forms for : i)Foundations, Footings, Bases for columns
ii) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge a) 110 mm dia
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level
b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and laying laterite stone aggregate 40 x 40 x 40 cm to cover the weep holes on the earth retaining side of retaining wall to act as filter media
Providing construction joints with 20mm thick thermacol sheets including cutting and placing in position etc. complete.
M/S Hussain Constructions Pvt.Ltd.
HRISHIKESH CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .