Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | -35.99% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹12.8 L+₹39,820.55 (3.20%)Admitted-Finance | -33.94% | ₹12.8 L+₹39,820.55 (3.20%) | L2 | Admitted-Finance |
| 3 | L3₹15.5 L+₹3.1 L (25.0%)Admitted-Finance | -20.00% | ₹15.5 L+₹3.1 L (25.0%) | L3 | Admitted-Finance |
| 4 | L3₹15.5 L+₹3.1 L (25.0%)Admitted-Finance | -20.00% | ₹15.5 L+₹3.1 L (25.0%) | L3 | Admitted-Finance |
| 5 | L4₹15.7 L+₹3.3 L (26.4%)Admitted-Finance | -19.10% | ₹15.7 L+₹3.3 L (26.4%) | L4 | Admitted-Finance |
Tender Value
₹19.4 L
EMD Value
₹38,840
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer
Kotranka
Permanent Restoration of Road from Ans Bridge to ADC office Kotranka
2026_PWDJK_317079_3
NIT No. 18 of 2026-27 dated 21.07.2026
Open Tender
Civil Works
Percentage
Kotranka
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Executive Engineer PWD RnB Division Kotranka
₹38,840
29 Aug 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mech means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres | 320 | Cum | 256.25 | ₹82,000 |
| 2 | Providing and laying in position cement concrete of 1:5:10 mix including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 20 | Cum | 4,826.5 | ₹96,530 |
| 3 | Providing and laying in position cement concrete of 1:3:6 mix including curing but excluding the cost of centring and shuttering. All work upto plinth level. With 20% Boulders | 176 | Cum | 4,774.4 | ₹8,40,294.4 |
| 4 | Dry random rubble masonary with hard stone in foundation and plinth with bond stone.(Quarry) | 159 | cum | 2,793.8 | ₹4,44,214.2 |
| 5 | Providing and filling stones in wire crates including cost of crates and stones etc | 100 | Cum | 1,800 | ₹1,80,000 |
| 6 | Hand Packed stone filling including cost of stones etc | 60 | Cum | 937.9 | ₹56,274 |
| 7 | Providing and laying 40 mm thick flooring with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 51 | Sqm | 510.25 | ₹26,022.75 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 370 | Sqm | 286.35 | ₹1,05,949.5 |
| 9 | P/F of PVC 75mm pipes for weep holes | 75 | Rmt | 300 | ₹22,500 |
| 10Material Consumptions and Carriages | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1037388.xls
BOQ • 0.30 MB
cyuiop.pdf
PDF • 0.37 MB
courtio.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .