Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance VILLAGE BASEDI KHADAR LAKSAR DISTT HARIDWAR | LAKSAR | HARIDWAR | UTTARAKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
2 Jul 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, CD, PWD Laksar
EE, CD, PWD Laksar
Construction of PC road from Laksar - Dhadheki motor road to vill. Bhurna at constituency Khanpur Distt. Haridwar under State Sector 2021-22 (JOB 7)
2021_pwd_33885_7
1050/6A Dated 17.06.2021
Open Tender
Civil Works - Roads
Item Rate
60 days
Laksar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EE, CD, PWD, Laksar
₹1.2 L
2 Jul 2021
24 Jun 2021
2 Jul 2021
24 Jun 2021
2 Jul 2021
25 Jun 2021
45 days
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction ofshoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Tack coat using VG-10 grade bitumen Over granular surfaces treated with primer @ 0.40 kg/sqm
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade Bitumen (VG-30) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type B as per Technical Specification Clause 508. Manual Means (Bitumen (VG-30))
Providing and laying seal coat sealing the voids in a Bitumen (VG-30) bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510
Brick on edge pavement with straight overburnt bricks laid on edge including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local sand and spreading blinding coat 1cm (3/8") depth of local sand over the entire surface and including supply of all materials, labour and T&P etc. required for proper completion of the work.
Details of 03 years maintenance :- 1- Defect Liability Period for work done will be 3 Years after actual date of completion. 2- Maintenance to be done by contractor for 3 years after actual date of completion of work for which Payment will be made 0.5% for Ist year, 1.0% for 2nd years & 1.50% for 3rd year over final cost of work done. All other required work shall be carried out by contractor as per direction of Engineer-in-charge such as follows :- (i) Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations. (ii) Maintenance of road side drains including minor slip/malba clearance, reshaping, deepening and regarding as well as catch water drains. (iii) Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal point. (iv) Maintenance of scuppers, Causeway & culverts by way of clearing, cleaning, Erosion repair, repairs to cracks, parapet walls and protection works. (v) Maintenance of road signs by way of cleaning and repainting. (vi) maintenance of 200 Metre Hectometer stone, Km stone and 5th km stone by way of refixing of tilted stones, repairing with cement mortar, painting and lettering. (vii) Repairing of pot holes and patches with same material for construction or as per direction for Engineer-in charge.
Maintenance for 1st year including all item of BOQ limited upto 0.50% of Estimated cost
Maintenance for 2nd year including all item of BOQ limited upto 1.00% of Estimated cost
Maintenance for 3rd year including all item of BOQ limited upto 1.50% of Estimated cost
Sh. Habbu S/o Sh. Jahid Husain
M/s GANI CONSTRUCTION CO.
stage.html
html • 0.09 MB
finance_40026.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .