| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -10.00% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹9.1 L (6.41%)Admitted-Finance | -4.23% | ₹1.5 Cr+₹9.1 L (6.41%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹9.8 L (6.92%)Admitted-Finance | -3.77% | ₹1.5 Cr+₹9.8 L (6.92%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹13.0 L (9.16%)Admitted-Finance | -1.76% | ₹1.5 Cr+₹13.0 L (9.16%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
20 Apr 2026, 5:00 pmClosed
GENERAL MANAGER CIVIL
SEC 6 NOIDA
M/o Building (Repair of Painting, Distempering, Kota Stone, Interlocking Paver Block and Other Miscellaneous Work in Community Center (3 Nos.) Village Sadarpur) Noida
2026_NOIDA_1134642_1
84/NOIDA/GM/SM-WC-03/2025-26
Open Tender
Civil Works - Others
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.1 L
23 Jul 2026
8 Apr 2026
21 Apr 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge.(DSR-18/I.No.2.6.1) | - | Cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exccding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. : All kinds of soil. (C.R.) The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge(CR) (DSR-2018/I.No. 2.8.1) | - | Cum | - | - |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. . (DSR-18/I.No-15.60) | - | Cum | - | - |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. DSR 2018/I.No. 15.56 | - | Sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth 1:4:8 ( 1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) DSR-18/I.NO. 4.1.8 | - | Cum | - | - |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth inCement mortar 1:4 (1 cement : 4 coarse sand) DSR No. 6.1.1 | - | Cum | - | - |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) DAR CODE - 6.4.1 | - | Cum | - | - |
| 8 | 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand) (DSR-18/I-13.4.1/P-222) | - | Sqm | - | - |
| 9 | Neat cement punning ( DSR- 18/ I- 13.18 ) | - | Sqm | - | - |
| 10 | Washed stone grit plaster on exterior walls of height upto 10 M. above level in two layers,under layer 12mm cement plaster 1:4 (1 cement : 4 coarse sand ) furrowing the under layer with scratching tool,applying cement slurry on the under layer @ 2 Kg of cement /Sqm top layer 15mm cement plater 1:1/2:2 (1 cement: 1/2 C sand: 2 stone chipping 10mm N.S.) in panels with groove all around as per approved pattern i/c scrubbing and washing the top layer with brusshes and water to expose the stone chipping complete as per. DSR 18/I.No. 13.72 | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2118236.xls
BOQ • 0.30 MB
TD.pdf
Tender Documents • 5.46 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .