Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,572.07Accepted-Finance | ₹84,572.07 | L1 | Accepted-Finance L1 |
| 2 | L2₹96,163.37Accepted-Finance | ₹96,163.37 | L2 | Accepted-Finance L2 |
| 3 | L3₹1.1 LAccepted-Finance NILAMBUR MUNICIPALITY PULIKKAL ABU ROAD CONCRETING IN WARD NO 16 PROJECT NO 19 KERALA KL | ₹1.1 L | L3 | Accepted-Finance L3 |
Tender Value
₹1.3 L
EMD Value
₹42.6 L
Closing Date
4 Aug 2026, 11:30 amClosed
Asst. Executive Engineer
Asst. Executive Engineer Water Supply Sub Division Kollam
DEPOSIT-Laying Work-Laying of 63mm PVC pipe line in the Thirumullavaram area in connection with Karkkidaka Vavubali
2026_KWA_863103_1
08/2026-27/AEE/WSSD/KLM
Open Tender
Civil Works - Water Works
Percentage
5 days
Thirumullavaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹555
Yes
₹42.6 L
Yes
24 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
29 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying of 63mm PVC pipe line at Thirumullavaram area | |||||
| 1.001 | OD93470/2026-2027:Conveyance of PVC pipes from KWA Store to Work SIte includeing const of loading, unloading, transportation etc complete | - | L.S | 3,653.39 | - |
| 1.002 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | 27.11 | - |
| 1.003 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | - | sqm | 443.5 | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | 678.19 | ₹677.51 |
| 1.005 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | 1,000.36 | - |
| 1.006 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | 32.23 | - |
| 1.007 | 100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. | - | metre | 104.31 | - |
| 1.008 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 1 | Kwh | 39.35 | ₹39.31 |
| 1.009 | 16.78.2:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | - | cum | 3,480.71 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1459961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NITkar.pdf
Tender Documents • 0.39 MB
BOQ_1459961.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].