Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAdmitted-Finance | ₹37.2 L | L1 | Admitted-Finance |
| 2 | L2₹40.2 LAdmitted-Finance | ₹40.2 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Krishna Engineering Works L2 | M/s MITUL ENGINEERING SERVICES L1 |
|---|---|---|---|---|---|
| 1.00Routine, preventive & minor break down maintenance work in general shift of AHP Pump house area, Stg- I to V, associated pumps, pipelines, valves, overhead cranes including checking of oil level & transportation of material from Stores Manpower Required | |||||
| 1.01 | Unskilled-02 Nos. | 2 | Per Day | 285 ₹3.7 L | 285 ₹3.4 L |
| 1.02 | Semi Skilled-02 Nos. | 2 | Per Day | 297 ₹3.8 L | 297 ₹3.5 L |
| 1.03 | Skilled-02 Nos. | 2 | Per Day | 309 ₹3.9 L | 309 ₹3.6 L |
| 1.04 | Highly Skilled-02 Nos. | 2 | Per Day | 359 ₹4.3 L | 359 ₹4.0 L |
| 2.00Routine, Emergency, Breakdown and shift maintenance works for operation of CMR system, drain pump, dewatering pump of both the units including following jobs. These Man Power will also be utilised by AEN(AHP-I/II) for AHP work in General duty. i) Operation of CMR system regularly in all the three shifts of Unit –1 & Unit-2. ii) Maintenance of CMR system as directed by the Engineer i n-charge ii) Unloading of hydro bin as required iii) Operation of drain pump. iv) Checking of operation of dewatering pump, if required. Man Power required | |||||
| 2.01 | Skilled-02 Nos. | 6 | Per Shift | 309 ₹11.6 L | 309 ₹10.8 L |
| 3.00Petrolling of all Ash disposal lines (line no. 1 to 8) round the clock for checking leakage anywhere from respective pump house to ash dyke & Daily checking of Ash Dyke for: i) Back flow of Ash water ii) Overflow from boundaries / embankment of ash. iii) Proper positioning of all lines on Steel Structure / Pedestal /Ash Bed. iv) Any leakage of pipe coupling etc. vi) Maintain all ADL record for rotation/ replacement of pipe & bends & other associated work as per direction of work incharge. Man Power required. | |||||
| 3.01 | Skilled-01 No | 1 | Per Day | 309 ₹1.9 L | 309 ₹1.8 L |
| 3.02 | Un -skilled-02 Nos. | 6 | Per Shift | 285 ₹11.0 L | 285 ₹10.1 L |
Tender Value
₹71.1 L
EMD Value
₹1.4 L
Closing Date
22 Jan 2026, 12:00 pmClosed
CHIEF ENGINEER KSTPS, KOTA
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Capital, Routine and Breakdown Maintenance of Pumps and Ash Disposal Lines upto Ash Dyke of Stage-I to V of KSTPS, Kota.
2025_RRVUN_523016_1
TN-5486
Open Tender
Repair and Maintenance Works
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
digitally as mentioned in tender documents
₹1.4 L
Yes
7 Apr 2026
5 Jan 2026
23 Jan 2026
5 Jan 2026
22 Jan 2026
5 Jan 2026
Routine, preventive & minor break down maintenance work in general shift of AHP Pump house area, Stg- I to V, associated pumps, pipelines, valves, overhead cranes including checking of oil level & transportation of material from Stores Manpower Required
Unskilled-02 Nos.
Semi Skilled-02 Nos.
Skilled-02 Nos.
Highly Skilled-02 Nos.
Routine, Emergency, Breakdown and shift maintenance works for operation of CMR system, drain pump, dewatering pump of both the units including following jobs. These Man Power will also be utilised by AEN(AHP-I/II) for AHP work in General duty. i) Operation of CMR system regularly in all the three shifts of Unit –1 & Unit-2. ii) Maintenance of CMR system as directed by the Engineer i n-charge ii) Unloading of hydro bin as required iii) Operation of drain pump. iv) Checking of operation of dewatering pump, if required. Man Power required
Skilled-02 Nos.
Petrolling of all Ash disposal lines (line no. 1 to 8) round the clock for checking leakage anywhere from respective pump house to ash dyke & Daily checking of Ash Dyke for: i) Back flow of Ash water ii) Overflow from boundaries / embankment of ash. iii) Proper positioning of all lines on Steel Structure / Pedestal /Ash Bed. iv) Any leakage of pipe coupling etc. vi) Maintain all ADL record for rotation/ replacement of pipe & bends & other associated work as per direction of work incharge. Man Power required.
Skilled-01 No
Un -skilled-02 Nos.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (Part A) (L-1 bidder shall be decided on totallity of Part -A & B) Wherein, same /equal bids received from two or more bidders i.e. resulting more than one L-1 bidder, in such situations , for the determination of L-1 bidder, all the bidders quoted same lowest rates shall be called for and decision shall be taken through a transparent lottery system in presence of all the bidders”. (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Capital, Routine & Breakdown Maintenance of Pumps and Ash Disposal Lines upto Ash Dyke of Stage-I To V of KSTPS, Kota (As per Part A of G-Schedule and scope of work)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_932893.pdf
techsummary_932893.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 26.32 MB
TN5486.pdf
Tender Documents • 3.41 MB
BOQ_932893.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid