Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Fee/PreQual/Technical/Finance AMBADY CHINNAR P O | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SABU PG L1 |
|---|---|---|---|---|
| 1.00First Floor Room Construction | ||||
| 1.00 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 10.61 | cum | 7,389.57 ₹78,381.17 Lowest |
| 1.00 | OD459646/2025-2026:Supplying Precast factory moulded RCC window frame of size 150X140cm or nearest size and fixing in position in line and level directed by the engineer in charge including fixing MS clamp 3 Nos with minimum length of 25 cms on each vertical side of the frame with necessary screws and fixing the clamp with concrete in wall using 1:2:4 concrete mix including all cost of conveyance, material cost , labour charges, curing charges etc.complete. | 11 | each | 3,745.91 ₹41,205.01 Lowest |
| 1.00 | 50.9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood | 0.07 | cum | 1,08,310.92 ₹7,040.21 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 10.14 | sqm | 730.84 ₹7,410.72 Lowest |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 19.56 | sqm | 979.02 ₹19,149.63 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 276 | kilogram | 107.71 ₹29,727.96 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.23 | cum | 12,877.57 ₹28,704.1 Lowest |
| 1.01 | 50.9.3.1:Providing and fixing paneled or paneled and glazed shutters for doors, windows and clerestory windows, 30 mm thick shutters including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding paneling which will be paid for separately, all complete as per direction 0f Engineer in- charge. using Anjili/ Jack wood | 2.05 | sqm | 3,094.51 ₹6,337.56 Lowest |
| 1.01 | 50.9.4.1:Providing and fixing paneling or paneling and glazing in paneled or paneled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured) paneling for paneled or paneled and glazed shutters 25 mm to 40 mm thick using good quality Anjili/ Jack wood | 1.5 | sqm | 2,758.58 ₹4,151.66 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,172
Closing Date
23 Jun 2026, 6:00 pmClosed
ASSI.EXECUTIVE ENGINEER LID EW DIVISION IDUKKI GP
ASSI.EXECUTIVEENGINEER LID EW DIVISION IDUKKIGP PAINAVU
Annual Plan-IDP-2025-26 AYYAPPANKOVIL G P- PACHAKKADU- SREE SAKTHI NILAYAM- WATER TANK ELECTRIFICATION-1104/26-General Civil Work
2026_LSGD_855466_35
03 lT / AEE/IID EW / IDK / 2oz 6-2027
Open Tender
Civil Works - Others
Item Rate
300 days
AYYAPPANKOVIL G P
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,870
Yes
₹21,172
Yes
29 Jun 2026
15 Jun 2026
26 Jun 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
15 Jun 2026 - 23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1First Floor Room Construction | |||||
| 1.001 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.002 | OD459646/2025-2026:Supplying Precast factory moulded RCC window frame of size 150X140cm or nearest size and fixing in position in line and level directed by the engineer in charge including fixing MS clamp 3 Nos with minimum length of 25 cms on each vertical side of the frame with necessary screws and fixing the clamp with concrete in wall using 1:2:4 concrete mix including all cost of conveyance, material cost , labour charges, curing charges etc.complete. | - | each | - | - |
| 1.003 | 50.9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood | 1 | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.005 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 1 | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.008 | 50.9.3.1:Providing and fixing paneled or paneled and glazed shutters for doors, windows and clerestory windows, 30 mm thick shutters including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding paneling which will be paid for separately, all complete as per direction 0f Engineer in- charge. using Anjili/ Jack wood | - | sqm | - | - |
| 1.009 | 50.9.4.1:Providing and fixing paneling or paneling and glazing in paneled or paneled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured) paneling for paneled or paneled and glazed shutters 25 mm to 40 mm thick using good quality Anjili/ Jack wood | 1 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1446450.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 8.90 MB
BOQ_1446450.xls
BOQ • 0.32 MB
NIT.pdf
Tender Documents • 0.03 MB
BID.pdf
Additional Documents • 1.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .