| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹19.9 L+₹5.8 L (41.6%)Rejected-Finance C O MODERN FURNITURE B I BAZAR BAREILLY CANTT BAREILLY 243001 UP | BAREILLY | BAREILLY | UP | 243001 | L2 | Rejected-Finance Other than L1 | |
| 3 | Rejected-Technical 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | - | Rejected-Technical Bidder is not enlisted in c(ii) category and has submitted one repair work miscellaneous items, including lift, however work completion date is 2019, which is more than 5 years old and therefore cannot be considered as per NIT criteria. |
| Sl No | Description | Qty | Unit | M/s Dhapola Elevator and Engineering L1 | D K THUKRAL AND SONS L2 |
|---|---|---|---|---|---|
| 1.00Section-I | |||||
| 2.00 | Carrying out comprehensive maintenance of electrically operated lifts 01 No in Tech bldg of Ground + 3 floor (total four landings) with electric power operated doors, auto electric levelling device of capacity 08 passenger lift installed in Tech area all as specified and directed (Total 1 x 11 Month = 11 units lifts ) Location :- Installed in Tech area. (Make of lift: Kone) | 11 | Each lift per Month | 12,500 ₹1,37,500 Lowest | 17,500 ₹1,92,500 |
| 3.00 | Carrying out comprehensive maintenance of electrically operated lifts 01 No in Tech bldg of Ground + 4 floor (total five landings) with electric power operated doors, auto electric levelling device of capacity 08 passenger lift installed in MOF bldg Tech area complete all as specified and directed (Total 1 x 11 Month = 11 units lifts ) Location :- Installed in Tech area. (Make of lift: Kone) | 11 | Each lift per Month | 13,500 ₹1,48,500 Lowest | 17,500 ₹1,92,500 |
| 4.00Notes : Applicable for item Sch 'A" Major unserviceable parts shall be measured and paid separately under section -II Srl item No 13 to 25 herein after as supply only in replacement and cost of labour required for replacement of spares/ accessories included in the quoted rates of Srl item Nos 02 & 03 herein before . However quoted rates of Srl item Nos 02 & 03 of Sch 'A' section-I is deemed to include the cost of minor spares/ accessories as mentioned in Srl item Nos 02 & 03 of Sch 'A' Section -I | |||||
| 5.00The OEM shall have to replace the unserviceable materials with the OEM materials only. Necessary paid vouchers shall be submitted from OEM for the materials like ARD, drive, motors etc. | |||||
| 6.00The OEM shall have to replace the u/s material only. Load testing for lift to be carried out once in a year through authorised Engineer and necessary test report shall be submitted . The entire work mentioned in this sch'A' incl comprehensive , preventive and periodical maintenance of lift/elevators shall be executed through OEM ie KONE only. Third party damage due to malfunctioning of lift shall be responsibility of the OEM. | |||||
| 7.00The comprehensive maintenance incl weekly , foutnightly, monthly, quarterly , half yearly, inspection / testing/ preventive maintenance replacement of un-serviceable parts/ material including labour , transportation cost . | |||||
| 8.00OEM shall rectify the defects with in 24 Hrs after receipt of complaints, other wise the complaint will be rectified by the other agency and the expenditure incurred will be recovered from the contractors dues . The penalty for not attending complaints shall be recovered at Rs 2000/- per day till proper functioning of lift . | |||||
| 9.00Old material will be produced to AGE E/M yard by the contractor . | |||||
| 10.00The schedule 'A' consists of comprehensive maintenance of M/S KONE lift in Tech area. The work under authorised dealer comprehensive maintenance of lift all as specified in Sch 'A' section I item 1 and 2 above . | |||||
Tender Value
₹19.9 L
EMD Value
₹39,770
Closing Date
24 Dec 2025, 6:00 pmClosed
CWE (AF) BAREILLY
HQ Commander Works Engineers (AF) Military Engineer Services Bareilly 243002
As described in BOQ
2025_MES_743323_1
81609/E8
Open Tender
Civil Works
Item Rate
330 days
GE (AF) BAREILLY
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) BAREILLY
₹39,770
12 Feb 2026
5 Dec 2025
1 Jan 2026
5 Dec 2025
24 Dec 2025
19 Dec 2025
Section-I
Carrying out comprehensive maintenance of electrically operated lifts 01 No in Tech bldg of Ground + 3 floor (total four landings) with electric power operated doors, auto electric levelling device of capacity 08 passenger lift installed in Tech area all as specified and directed (Total 1 x 11 Month = 11 units lifts ) Location :- Installed in Tech area. (Make of lift: Kone)
Carrying out comprehensive maintenance of electrically operated lifts 01 No in Tech bldg of Ground + 4 floor (total five landings) with electric power operated doors, auto electric levelling device of capacity 08 passenger lift installed in MOF bldg Tech area complete all as specified and directed (Total 1 x 11 Month = 11 units lifts ) Location :- Installed in Tech area. (Make of lift: Kone)
Notes : Applicable for item Sch 'A" Major unserviceable parts shall be measured and paid separately under section -II Srl item No 13 to 25 herein after as supply only in replacement and cost of labour required for replacement of spares/ accessories included in the quoted rates of Srl item Nos 02 & 03 herein before . However quoted rates of Srl item Nos 02 & 03 of Sch 'A' section-I is deemed to include the cost of minor spares/ accessories as mentioned in Srl item Nos 02 & 03 of Sch 'A' Section -I
The OEM shall have to replace the unserviceable materials with the OEM materials only. Necessary paid vouchers shall be submitted from OEM for the materials like ARD, drive, motors etc.
The OEM shall have to replace the u/s material only. Load testing for lift to be carried out once in a year through authorised Engineer and necessary test report shall be submitted . The entire work mentioned in this sch'A' incl comprehensive , preventive and periodical maintenance of lift/elevators shall be executed through OEM ie KONE only. Third party damage due to malfunctioning of lift shall be responsibility of the OEM.
The comprehensive maintenance incl weekly , foutnightly, monthly, quarterly , half yearly, inspection / testing/ preventive maintenance replacement of un-serviceable parts/ material including labour , transportation cost .
OEM shall rectify the defects with in 24 Hrs after receipt of complaints, other wise the complaint will be rectified by the other agency and the expenditure incurred will be recovered from the contractors dues . The penalty for not attending complaints shall be recovered at Rs 2000/- per day till proper functioning of lift .
Old material will be produced to AGE E/M yard by the contractor .
The schedule 'A' consists of comprehensive maintenance of M/S KONE lift in Tech area. The work under authorised dealer comprehensive maintenance of lift all as specified in Sch 'A' section I item 1 and 2 above .
The cost of labour required for replacement of spares/ accessories, as mentioned in section -II item No. 13 to 25 deemed to be included in the quoted rates .
SECTION : II
Supply only drive module, KDL 16L 12A 400V with all connected accessories complete all as specified and directed.
Supply only AVD7S assembly with all connected accessories complete all as specified and directed.
Supply only AMD D1 to D10 replacement package with all connnected accessories complete all as specified and directed.
Supply only toothed belt, drive 1 W= 12mm with all connected accessories complete all as specified and directed.
Supply only Sensor magnet 250V DC 250V AC 3A D12MM with all connected accessories complete all as specified and directed.
Supply only CIGAR switch , 61 N with all connected accessories complete all as specified and directed.
Supply only CIGAR switch , 61 U with all connected accessories complete all as specified and directed.
Supply only CIGAR switch 30 with all connected accessories complete all as specified and directed.
Supply only Emergency rescue device ERD 06, LCE with all connected accessories complete all as specified and directed.
Supply only Handsfree intercom, W muting feature with all connected accessories complete all as specified and directed.
Supply only EPABX assy, intercom 4 port with all connected accessories complete all as specified and directed.
Supply only LCS, UP DOWN NB7 SEG Single, with all connected items complete all as specified and directed
Repair and overhauling of lifts including cleaning, maintenance & serviceability complete all as specified and directed.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
81609tender.pdf
Tender Documents • 1.06 MB
BOQ_832337.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .