Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹50,000
EMD Value
₹1,000
Closing Date
23 Mar 2020, 6:55 pmClosed
Executive Engineer Mech. Irrig. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 75HP, 1470 RPM, 3 phase induction motor of Lift Irrigation Scheme Kanispora.
2020_IFC_95246_18
eNIT 12 of 2019-20
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Kanispora Baramulla
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
Yes
Executive Engineer Mech. Irrig. Baramulla
₹1,000
Yes
Mech. Irrig. Div. Baramulla
13 Apr 2020
17 Mar 2020
24 Mar 2020
17 Mar 2020
23 Mar 2020
17 Mar 2020
20 Mar 2020
Amount
Dismantling of motor from the pump by way of disengaging VT bowl assembly from motor using chain pulley block and allied tools and tackles, carrying to the loading site, loading in private vehicle and shifting the same to the workshop for necessary repairs by private load carrier.
Dismantling of motor at workshop by way of disassembling the stator-rotor assembly and assessing the damages. The job includes extraction of damaged windings from the slots of stator.
Complete rewinding of stator coils as per sample wire of standard size and quality. The weight of copper used is about 38kg each coil).
Providing and fitting of insulating material in the slots of the stator including bamboo straps and latheride paper etc.
Varnishing of the windings using good quality varnish. The job includes heat treatment process using conventional method.
Reassembling of the stator rotor assembly carefully without causing any damage to the windings.
Shafting of 75 HP motor after taking necessary repairs at work shop by loading in private load carrier and shifting to site i.e Lift Irrigation Scheme Kanispora. The job includes refitting of motor at the site to ensure proper alignment with pump. The job also includes testing of the motor on full load after connecting 3-phase power supply connections.
Deduct the cost of old scrap as 80% weight of copper winding at S. no. 03 i.e. 30.4 Kg.
M/s SAJAD ENGINEERING WORKS
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .