| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.5 LQualified F 50 OPP MULTIMETALS LTD INDUSTRIAL AREA KOTA 324003 KOTA RAJASTHAN 324003 | KOTA | RAJASTHAN | 324003 | L1 | Qualified MSE, Category: General |
Tender Value
₹78.1 L
EMD Value
₹1.6 L
Closing Date
19 Apr 2025, 1:00 pmClosed
point 5kW up to 7 point 5 kW as per Part B scope of work Total quantity 1 is equal to 8..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Replacement of PVC cooling fan for motors size more than 7 point 5kW upto 15kW as per Part B scope of work Total quantity 1 is equal to 8 Nos for ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Replacement of PVC cooling fan for motors size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 8 Nos for two ye..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1kg up to 4 kg as per Part B scope of work Total quantity 1 is equal to 2..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 4 kg up to 16 kg as per Part B scope of work Total quantity 1 is equal to..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 16 kg up to 48 kg as per Part B scope of work Total quantity 1 is equal t..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 48 kg up to 96 kg as per Part B scope of work Total quantity 1 is equal t..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 96 kg up to 192 kg as per Part B scope of work Total quantity 1 is equal ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 192 kg up to 378 kg as per Part B scope of work Total quantity 1 is equal..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 378 kg up to 500 kg as per Part B scope of work Total quantity 1 is equal..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 500 kg up to 1000 kg as per Part B scope of work Total quantity 1 is equa..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1000 kg up to 1500 kg as per Part B scope of work Total quantity 1 is equ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1500 kg up to 3000 kg as per Part B scope of work Total quantity 1 is equ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size up to 1 ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size more tha..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Bid Details 5/152 Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size more th..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size up to 1 point 5 kW Material cast iron for above end cover is in contra..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 1 point 5kW up to 7 point 5 kW Material cast iron for above ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 7 point 5kW up to 15kW Material cast iron for above end cove..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 15kW up to 45kW Material cast iron for above end cover is in ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 45kW up to 90kW Material cast iron for above end cover is in..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 90kW up to 180kW Material cast iron for above end cover is in..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size up to 1 point 5 kW as per Part B scope of work Total quanti..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 1 point 5kW up to 7 point 5 kW as per Part B scope..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 7 point 5kW up to 15kW as per Part B scope of work ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 15kW up to 45kW as per Part B scope of work Total q..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 45kW up to 90kW as per Part B scope of work Total..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 90kW up to 180kW as per Part B scope of work Total..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Material cost iron for making of cooling fan end cover as per Part B scope of work Total quantity 1 is Bid Details 6/152 equal to 100 Kg for two years; Service Provi..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is eq..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 1 point 5kW up to 7 point 5 kW as per Part B scope of work ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 7 point 5kW up to 15kW as per Part B scope of work Total qu..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 15Kw up to 45kW as per Part B scope of work Total quantity ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 45kW up to 90kW as per Part B scope of work Total quantity 1..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 90kW up to 180kW as per Part B scope of work Total quantity ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size up to 15kW as per Part B scope of work..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 15kW up to 45kW as per Part ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 45kW up to 90kW as per Part ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 90kW to 180kW as per Part B..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size up to 1 point 5 k..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 1 point..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 7 point..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 15 up t..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Bid Details 7/152 Dismantling and refitting without varnish and baking size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for tw..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work Total quantity 1 is e..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work Total quantity 1 is equal t..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 2 Nos ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 1 Nos..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 1 No..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two y..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work Total quantity 1 is equa..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work Total quantity 1 is equal to 3 ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 3 Nos for..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 3 Nos fo..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size less than 1 point 1 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; Service..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size 1 point 1 kW to 2 point 2 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 2 point 2 kW up to 5 point 5 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos f..
Repair
Maintenance
and Bid Details 8/152 Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 5 point 5 kW up to 15 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two y..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 15kW up to 30kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; Ser..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 30 up to 45kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; Se..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; S..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6203 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6204 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6205 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6206 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6208 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6209 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6310 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6312 as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6312 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6313 C3 as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz Bid Details 9/152 motors size more than 75 kW up to 90 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for tw..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 90 kW up to 110 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for t..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 110 kW up to 132 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 132 kW up to 140 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz windings motors size More than 140 kW up to 180 kW as per Part C scope of work Total quantity 1 is equal to 2 ..
7631039
GEM/2025/B/6044925
Two Packet Bid
point 5kW up to 7 point 5 kW as per Part B scope of work Total quantity 1 is equal to 8..
323303, Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.
Total value wise evaluation
SERVICE
3 documents required · 3 mandatory
7 yrs
₹3
₹1.6 L
29 Mar 2025
29 Mar 2025
19 Apr 2025
point 5kW up to 7 point 5 kW as per Part B scope of work Total quantity 1 is equal to 8..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Replacement of PVC cooling fan for motors size more than 7 point 5kW upto 15kW as per Part B scope of work Total quantity 1 is equal to 8 Nos for ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Replacement of PVC cooling fan for motors size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 8 Nos for two ye..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1kg up to 4 kg as per Part B scope of work Total quantity 1 is equal to 2..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 4 kg up to 16 kg as per Part B scope of work Total quantity 1 is equal to..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 16 kg up to 48 kg as per Part B scope of work Total quantity 1 is equal t..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 48 kg up to 96 kg as per Part B scope of work Total quantity 1 is equal t..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 96 kg up to 192 kg as per Part B scope of work Total quantity 1 is equal ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 192 kg up to 378 kg as per Part B scope of work Total quantity 1 is equal..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 378 kg up to 500 kg as per Part B scope of work Total quantity 1 is equal..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 500 kg up to 1000 kg as per Part B scope of work Total quantity 1 is equa..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1000 kg up to 1500 kg as per Part B scope of work Total quantity 1 is equ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dynamic balancing of rotor with 2 point 5microns accuracy size more than 1500 kg up to 3000 kg as per Part B scope of work Total quantity 1 is equ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size up to 1 ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size more tha..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Bid Details 5/152 Supply and installation of terminal plate or terminal studs with insulators One quantity includes terminal studs for all three phases size more th..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size up to 1 point 5 kW Material cast iron for above end cover is in contra..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 1 point 5kW up to 7 point 5 kW Material cast iron for above ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 7 point 5kW up to 15kW Material cast iron for above end cove..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 15kW up to 45kW Material cast iron for above end cover is in ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 45kW up to 90kW Material cast iron for above end cover is in..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of end cover including machining drilling and threading etc to size more than 90kW up to 180kW Material cast iron for above end cover is in..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size up to 1 point 5 kW as per Part B scope of work Total quanti..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 1 point 5kW up to 7 point 5 kW as per Part B scope..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 7 point 5kW up to 15kW as per Part B scope of work ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 15kW up to 45kW as per Part B scope of work Total q..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 45kW up to 90kW as per Part B scope of work Total..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Making of cooling fan including machining keyway and key hub Excluding material size more than 90kW up to 180kW as per Part B scope of work Total..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Material cost iron for making of cooling fan end cover as per Part B scope of work Total quantity 1 is Bid Details 6/152 equal to 100 Kg for two years; Service Provi..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is eq..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 1 point 5kW up to 7 point 5 kW as per Part B scope of work ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 7 point 5kW up to 15kW as per Part B scope of work Total qu..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 15Kw up to 45kW as per Part B scope of work Total quantity ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 45kW up to 90kW as per Part B scope of work Total quantity 1..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing plates with material Same as original size more than 90kW up to 180kW as per Part B scope of work Total quantity ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size up to 15kW as per Part B scope of work..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 15kW up to 45kW as per Part ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 45kW up to 90kW as per Part ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 90kW to 180kW as per Part B..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size up to 1 point 5 k..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 1 point..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 7 point..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 15 up t..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Bid Details 7/152 Dismantling and refitting without varnish and baking size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for tw..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work Total quantity 1 is e..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work Total quantity 1 is equal t..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 2 Nos ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 1 Nos..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting without varnish and baking size more than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 1 No..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size up to 1 point 5 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two y..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work Total quantity 1 is equa..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work Total quantity 1 is equal to 3 ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 15kW up to 45kW as per Part B scope of work Total quantity 1 is equal to 3 Nos for..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Dismantling and refitting with varnish and baking size more than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 3 Nos fo..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size less than 1 point 1 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; Service..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size 1 point 1 kW to 2 point 2 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 2 point 2 kW up to 5 point 5 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos f..
and Bid Details 8/152 Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 5 point 5 kW up to 15 kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two y..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of oil seal size more than 15kW up to 30kW as per Part B scope of work Total quantity 1 is equal to 5 Nos for two years; Ser..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 30 up to 45kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; Se..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 45kW up to 90kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; S..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing and Fixing of Space Heater size More than 90kW up to 180kW as per Part B scope of work Total quantity 1 is equal to 2 Nos for two years; ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6203 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6204 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6205 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6206 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6208 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6209 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6310 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6312 as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6312 ZZ as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Providing of SKF make Bearing 6313 C3 as per Part B scope of work Total quantity 1 is equal to 10 Nos for two years; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz Bid Details 9/152 motors size more than 75 kW up to 90 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for tw..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 90 kW up to 110 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for t..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 110 kW up to 132 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for..
and Installation of Plant Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors size More than 132 kW up to 140 kW as per Part C scope of work Total quantity 1 is equal to 1 Nos for ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz windings motors size More than 140 kW up to 180 kW as per Part C scope of work Total quantity 1 is equal to 2 ..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7631039.pdf
GEM_BID
1741686482.pdf
OTHER
1741840270.pdf
OTHER
ATC_1dd0080d-93ea-40cb-8ee11741690088205_rrsuser8.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .