Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
25 Sept 2026, 6:30 pmClosed
Executive Engineer, Panchayat Irrigation Division, Dahod
Canal Restoration work for Suki Main Minor Irrigation Scheme, Taluka-Zalod, Dist.: Dahod
341398
2 of 2026-27
Open
Civil - All
Works
Dahod
3 documents required · 2 mandatory · 1 optional
₹3,600
EXECUTIVE ENGINEER, PANCHAYAT IRRIGATION DIVISION, DAHOD
₹1.6 L
2 Sept 2026
2 Sept 2026
2 Sept 2026
25 Sept 2026
2 Sept 2026
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Jungle Cutting : Rupees
Clearing the canal Banks outer and Three Lakh
inner Slopes by Jungle Cutting Sixteen
,removing Vegetation, Ghabajaria, Thousand
30714.00 Trees, etc. along with burning it's 10.30 Three Sqm ₹
and carrying away as and where Hundred
required and as directed etc. Fifty-Four
completed by machineries. and Twenty
Clearing the silt from the
canal/drain bed by a digging the Rupees One
same to the required bed level and Lakh Fifteen
gradient including depositing the Thousand
664.00 excavated earth regularly in spoil 173.30 Cum ₹
bank for utilizing the same and Twenty
preparing the banks after breaking Paise Only
clods as and where directed for all
leads and lifts. For Canals Below
20 Cusec. & 0 to 1.5 m lift.
Dismantaling of Stone Masonry: Rupees
Dismantling the existing stone Eight
masonry including sorting out and Thousand
stacking the useful material and Seven
removing the debris and making Hundred
good the damages etc. complete Fifty-Six and
as directed. In Cement Mortar Seventeen
Dismentaling of NP Pipe:
Dismantling the existing R.C.C. Rupees Four
Pipes including sorting out and Thousand
stacking of the useful materials of Three
the following diameters including Hundred
refilling the trenches etc. complete Thirty-Two
as directed. (c)600 mm. to 900 Only
Excavation for foundation in all Rupees Nine
sorts of soil including yellow sandy Thousand
gravelly soils ,soft & hard murrum Eight
etc. in dry condition including Hundred
depositing the excavated stuff in Eleven and
uniform layers in banks or as and Ninety-
where directed etc. complete for Seven Paise
lead up to 500m and all lift. (BY Only
TRIBAL AREA DEV. WORKS SUB DIVISION, ZALOD
Memorandum Canal Restoration work for Suki Main Minor Irrigation Scheme,Taluka-Zalod,
Showing Items To be
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Concrete 1:3:6 and MSA-40mm
Providing & Laying in position
"NOMINAL MIX" cement concrete Rupees
using cement, sand and crushed Thirty-Seven
aggregate by mass and machine Thousand
mix for C.C./R.C.C work incl. One
11.11 necessary formworks centering, 3346.00 Cum ₹
scaffolding, compaction by vibrator, Seventy-
curing as directed with all lead & lift Four and Six
etc complete Without Dewatering Paise Only
and excluding cost of steel
reinforcement. (a) C. C. Nominal
Mix, M-10 and MSA-40 mm
Concrete Nominal mix 1:1.5:3
Providing & Laying in position Rupees
"NOMINAL MIX" cement concrete Seven Lakh
using cement, sand and crushed Fifty-Seven
aggregate by mass and machine Thousand
mix for C.C./R.C.C work incl. Seven
176.39 necessary formworks centering, 4296.00 Cum ₹
scaffolding, compaction by vibrator, Seventy-One
curing as directed with all lead & lift and Forty-
etc complete Without Dewatering Four Paise
and excluding cost of steel Only
reinforcement. (f) C. C. Nominal
Mix, M-20 and MSA-20 mm
Providing & Laying in position
"NOMINAL MIX" cement concrete
using cement, sand and crushed upees One
aggregate by mass and machine Lakh Fifty-
mix for C.C./R.C.C work incl. Two
necessary formworks centering, Thousand
scaffolding, compaction by vibrator, Eighty-
curing as directed with all lead & lift Seven and
etc complete Without Dewatering Seventy-Five
and excluding cost of steel Paise Only
(c) C. C. Nominal Mix, M-15 and
Reinforcement: Rupees
Providing & Placing in position Eighty-Six
reinforcement bars including Thousand
cutting, bending, welding joints One
1.05 where necessary, hooking etc. 82019.00 Hundred MT ₹
complete as per drawing for all Nineteen
lead and lifts. (1) TMT / CRS (FE and Ninety-
500 D) Five Paise
TRIBAL AREA DEV. WORKS SUB DIVISION, ZALOD
Memorandum Canal Restoration work for Suki Main Minor Irrigation Scheme,Taluka-Zalod,
Showing Items To be
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Backfill: Rupees
Backfilling the foundation trenches Seven
around the structures etc with Hundred
selected excavated stuff including Two and
watering, ramming, compacting Twenty-One
etc. complete. (By Machinery) Paise Only
Dismantling of Brick Masonry : Rupees
Dismantling the existing brick Seven
masonry including sorting out and Hundred
6.70 stacking the useful material and 110.80 Cum ₹
removing the debris and making and Sixty
good the damages etc. complete Paise Only
as directed. In Cement Mortar
Compaction of canal banks:
Compaction for making Rupees One
embankment for canal by laying in Hundred
regular layers of 15 cm in thickness Eighty-Five
6.70 including breaking clods to 25 mm 27.70 Cum ₹
size incl. light rolling by suitable Five Paise
rollers with slight watering to Only
facilitate rolling and dressing the
side slopes etc.
Excavation of canal section: Rupees
Excavation of canal in all sorts of Forty-One
soil including soft and hard murrum Lakh
including depositing the excavated Seventy-Six
40550.29 stuff in uniform layers in canal 103.00 Thousand Cum ₹
banks or as and where directed etc Six Hundred
complete in varying lead upto 500 Eighty and
m and with all lifts. ( By Machinery) Thirteen
Dismentaling of old Linning: Rupees Ten
Dismantling the C.C. lining Lakh Sixty-
including including disposing off Two
the dismentalled materials as Thousand
directed etc. complete. Six Hundred
(1) 7.50 cm thick Fifty-Two
TRIBAL AREA DEV. WORKS SUB DIVISION, ZALOD
Memorandum Canal Restoration work for Suki Main Minor Irrigation Scheme,Taluka-Zalod,
Showing Items To be
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Linning of canal:
Prov. & Laying in position
Controlled cement concrete using
cement, sand and crushed
aggregate by mass and machine
mix for C.C work in canal lining
incl. necessary formworks
centering scaffolding compaction
by plate vibrator, curing as directed
with all lead & lift etc complete incl
27120.10 dressing the bed and trimming the 340.00 sqm ₹
canal section if required and minor
filling with murrum / earth as per
site condition to the correct profile,
incl providing bitumen joints as per
drawing and specified interval.
(Without using paver machineries.)
D) For 7.50cms thick cast-in-citu
canal lining in M-15 grade of
conc,with MSA-20mm without
Cleaning work for Culvert :
Clearing the silt/debris from the Rupees
pipe culvert/syphon/syphon Nineteen
well.Underground pipe drain/box Thousand
drain for Drain/Canal by digging Two
the same including depositing the Hundred
excavated earth/debris etc. for all Four and
leads and lift. Fifty Paise
(A) For pipe culvert/ Syphon. (i) Only
Upto 900 mm dia. Pipe.
Chipping / Removing Old Rupees One
Plaster: Thousand
Scrapping out the old plaster and Seven
cleaning the surface including Hundred
racking out the joints 20 mm. deep. Thirty-Two
TRIBAL AREA DEV. WORKS SUB DIVISION, ZALOD
Memorandum Canal Restoration work for Suki Main Minor Irrigation Scheme,Taluka-Zalod,
Showing Items To be
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Crack filling in CC
Lining/RCC/PCC irrigation
structure's components with epoxy
based putty incl racking the cracks
cleaning curing etc complete.Prime
coat done with material of
Resin+Hardener mixing of BIS
quality material & quality that works
in wetted condition. Pointing done
with water plugging BIS quality
material in first coat and after that
second coat done with epoxy
based putty of Resin Hardener
mixing ( 1 part Resin +1 part
Hardener ,+ 8 part Silica ). The rate
includes cost of materials labours
scaffolding equipments etc
Plaster Work: Rupees Four
Providing cement plaster 6 mm Thousand
20.00 thick in C.M.1:3 to the R.C.C.work 240.20 Eight Sqmt ₹
including making the surface rough Hundred
for bonding , watering, finishing, Four Only
curing, scaffolding etc. complete.
Providing 25 to 40 mm ( 1" to 1.5" )
thick guniting in cement mortar 1:2 Rupees
cement and sand proportion Twenty-Four
including binding 6 mm dia. Thousand
20.00 reinforcement @ 9.24 kg/m2 for 1243.80 Eight Sqmt ₹
cement concrete works including Hundred
finishing , curing and use of air Seventy-Six
compressor and guniting Only
equipments and accessories with
all costs of materials and labours
required for the work.
I.R.S./NP4,R.C.C. PIPE 900 MM
Providing and fixing in position ( Rupees
different diameter ) I.R.S./NP4, Nineteen
R.C.C. pipe with caulking the joints Thousand
5.00 with cement mortar 1:1 3938.70 Six Hundred Rmt ₹
proportion,using jute string soaked Ninety-Three
in cement slurry, finishing joints and Fifty
and laying pipes to the designed Paise Only
grade and levels, curing etc.
complete for all leads and lifts.
TRIBAL AREA DEV. WORKS SUB DIVISION, ZALOD
Memorandum Canal Restoration work for Suki Main Minor Irrigation Scheme,Taluka-Zalod,
Showing Items To be
Estimated Rates
Quantities Total Amount
Quantities Total Amount
Estimated but according to
Item of works In Unit
may be more or In Figures estimated Quantities
Cross Regulator Gate:
Manufacture,supply and erection of
vertical gate consistinggate leaf, Rupees One
stiffeners, rubber seal, embedded Lakh Four
parts as shown in drawings Thousand
including cost if materials, Five
2.00 fabrication, painting, erection in 52262.77 Hundred Nos. ₹
position with all accessories Twenty-Five
second stage concreting etc and Fifty-
complete as per drawing and Four Paise
specifications. (OPEN TYPE Only
Rupees One Crore Sixty-One Lakh Twenty-Seven Thousand Two Hundred Sixty-Nine and Thirty-Five Paise
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP of SUKI.pdf
Schedule-B Sukhi.pdf
nivida-2 -2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .