| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹90.4 L+₹9.0 L (11.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.2 Cr+₹41.4 L (50.8%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹81.9 L
EMD Value
₹50,000
Closing Date
15 Feb 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer Project Division, Kerala Water Authority, TVPM
AMRUT Laying Transmission main and Sewer net works in Block J Karimanal Collection and convce system Phase I Laying 630mm HDPE Trunk main from MH 17 to PH at Karimanal by HDD method 3rd Reach Pipe laying App Ahard rock through HDD method
2023_KWA_557151_1
39/2022-23/KWA/PD/TVM (RT2)
Open Tender
Civil Works - Water Works
Item Rate
60 days
Thiruvananthapuram
AMRUT Laying Transmission main and Sewer net works in Block J Karimanal Collection and convce system Phase I Laying 630mm HDPE Trunk main from MH 17 to PH at Karimanal by HDD method 3rd Reach Pipe laying App Ahard rock through HDD method
5 documents required · 5 mandatory
₹2,760
₹50,000
9 Mar 2023
10 Feb 2023
16 Feb 2023
10 Feb 2023
15 Feb 2023
10 Feb 2023
10 Feb 2023 - 15 Feb 2023
Amount
Working charges
OD153189/2022-2023:Laying and installation of HDPE- 630MM DIA, PE-80, (PN-8)- IS-14333 pipe by horizontal directional drilling method in all types of soil including water table up to 8m depth for gravity sewer including preparing, and setting up the plant and equipment, installing new pipe work, testing and commissioning excluding the cost of pipe (6m line pipe with butt joint) all related civil/mechanical works like entry/exit pits as necessary. Dewatering, drilling, stringing, reaming, pulling back the new pipe on the designed alignment and monitoring by the approved guidance system. Wastage of pipes, proper disposal of drilling fluid/bentonite slurry. Proper backfilling of pits and holes by approved borrow material as per specification, approved method statement or as directed by the Engineer in charge. including utility shifting and breakdown charges.
OD153201/2022-2023:Laying and installation of HDPE- 630MM DIA, PE-80, (PN-8)- IS-14333 pipe by horizontal directional drilling method in hard rock (blasting prohibited) above/below water table up to 8m depth for gravity sewer including preparing, and setting up the plant and equipment , installing new pipe work, testing and commissioning excluding cost of pipe (6m line pipe with butt joint) all related civil/mechanical works like entry/exit pits as necessary. Dewatering, drilling, stringing, reaming, pulling back the new pipe on the designed alignment and monitoring by the approved guidance system. Wastage of pipes, proper disposal of drilling fluid/bentonite slurry. Proper back filling of pit and holes by approved borrow material as per specification, approved method statement or as directed by the Engineer in charge. including utility shifting and breakdown charges.
Dinu Electricals
Renjumon
Bidder Name
Dinu Electricals
Renjumon
Mathews Kollappally
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_819575.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .